Title: Request for approval of an award on the basis of low bid to MC2 Civil, LLC in the amount of $3,194,500 for construction of the Downtown Tunnel Flood Mitigation Lift Station for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250131), MWBE Contracted Goal: 9.12%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): 250131

Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC

 

MWBE Contracted Goal (if applicable): 9.12%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to MC2 Civil, LLC in the amount of $3,194,500 for construction of the Downtown Tunnel Flood Mitigation Lift Station for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250131), MWBE Contracted Goal: 9.12%.

end

 

Background and Discussion:

The Harris County Downtown Tunnel System connects and provides access to 15 County buildings in Downtown Houston. This project aims to mitigate flooding by installing a large lift station with several sump pumps, powered by an emergency generator on the most vulnerable part of the tunnels, covering the area from the Criminal Justice Center to the Juvenile Justice Center and Civil Court house, to ensure proper flood water removal during extreme weather events.

 

Expected Impact:

Awarding this project to the selected vendor will permit this project to transition to the construction phase, thus implementing the flood mitigation plan for the Downtown Tunnel System. The large lift station will ensure proper flood water removal during extreme weather events.

 

Alternative Options:

Not to award this project, thus keeping the flooding problem unresolved, or award to a higher bidder with a consequential increase in cost.

 

County Strategic Plan Goal:  Choose an item.

County Strategic Plan Objective: Choose an item.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/08/2025

429

Advertisement Approved

 

Location:

Address (if applicable): 201 Caroline St Houston, TX 77002

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Construction of the Downtown Tunnel Flood Mitigation Lift Station for Harris County Precinct 1

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper     Countywide (035)                     

$3,194,500.00

$

$3,194,500.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$3,194,500.00

$

$3,194,500.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$3,194,500.00

$

$3,194,500.00

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): 9/18/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Flavius Martin, Project Manager; Andreas Peeples, CPC, CCM, Director of Capital Projects Facilities- Vertical Design and Construction, Office of the County Engineer; Lyndsey Bars, Senior Buyer, Purchasing

 