Legislation Details

File #: 26-7050    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/14/2026 In control: Commissioners Court
On agenda: 10/29/2026 Final action: 10/29/2026
Title: Request for approval of a second amendment to an agreement with Geotest Engineering, Inc. in the amount of $35,154.75 for Professional Engineering Services regarding Construction Materials Testing and related Services for E132-00-00 Mitigation Project – 2020, UPIN 21090MF22E01, Precinct 3, MWBE Contracted Goal: 100%.
Attachments: 1. Amd-21090MF22E01-E132-00-00 Mitigation Project-Geotest-P3-10.29.26.pdf

 Primary Department: County Engineer

 Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

 Secondary Department: Commissioner, Precinct 3

 Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

 

 Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 21090MF22E01; Job No. 23/0429

Vendor/Entity Legal Name (if applicable): Geotest Engineering, Inc.

 

MWBE Contracted Goal (if applicable): 100%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a second amendment to an agreement with Geotest Engineering, Inc. in the amount of $35,154.75 for Professional Engineering Services regarding Construction Materials Testing and related Services for E132-00-00 Mitigation Project - 2020, UPIN 21090MF22E01, Precinct 3, MWBE Contracted Goal: 100%.

end

 

Background and Discussion:

This project includes installation of 439 linear feet of underground drainage utilities, construction of a storm water detention basin, regrading of 8,000 linear feet of existing drainage channels with concrete slope pavement placement, installation of 6,606 square feet of crushed limestone subgrade, and construction of nine headwalls.  Geotest Engineering, Inc. will provide construction materials testing services to support the project in construction.

 

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/05/2023

54 (23-6953)

Approved Authorization to Negotiate

01/30/2024

54 (24-0578)

Approved Award of Agreement

09/18/2025

15 (25-5608)

Approved Contract Amendment #1

 

Location: E132-00-00 Mitigation Project - 2020

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$35,154.75

$35,154.75

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$35,154.75

$35,154.75

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$35,154.75

$35,154.75

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/29/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract and Exhibits