Legislation Details

File #: 26-6275    Version: 1 Name:
Type: Grant Status: Agenda Ready
File created: 9/9/2026 In control: Commissioners Court
On agenda: 9/22/2026 Final action:
Title: Request by the Office of the County Engineer for approval of a grant resolution with the intent to execute an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for the Highway Safety Improvement Program (HSIP): Sidewalk & Crosswalk - West Rd. & Homestead Rd. Project in Precinct 2.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer 

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner, Precinct 2 

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Award

 

Project ID (if applicable): UPIN 24102MF36201 - Sidewalk - West Road;
                                                                     UPIN 24102MF34F01 - Sidewalk - Homestead Road

Vendor/Entity Legal Name (if applicable): Texas Department of Transportation

 

MWBE Contracted Goal (if applicable):

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): 0%

Justification for 0% Grant Indirect Costs Rate (if applicable): Infrastructure (Design, Construction, Maintenance)

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval of a grant resolution with the intent to execute an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for the Highway Safety Improvement Program (HSIP): Sidewalk & Crosswalk - West Rd. & Homestead Rd. Project in Precinct 2.

end

 

Background and Discussion:

As FY25 awardees under the HSIP, the West Road and Homestead Road sidewalk projects advance federal safety priorities aimed at reducing pedestrian fatalities and serious injuries, while also supporting Harris County’s goal to provide safe, reliable, equitably distributed, and well-maintained infrastructure.

 

The West Road project improves pedestrian connectivity along a commercial and school-serving corridor by constructing six-foot sidewalks, ADA-compliant curb ramps, and drainage enhancements between Veterans Memorial Drive and I-45. The Homestead Road project enhances safety for surrounding neighborhoods, businesses, and an elementary school by installing new sidewalks, upgrading curb ramps, reconstructing driveways, and improving drainage from I-69 to Mary Francis Drive.

 

Expected Impact:

These HSIP-funded sidewalk improvements will strengthen Harris County’s transportation network by enhancing pedestrian safety and multimodal accessibility along two corridors with high residential, school, and commercial activity. The West Road and Homestead Road projects will install continuous sidewalks, ADA-compliant ramps, driveway upgrades, and drainage improvements. These measures will reduce pedestrian-vehicle conflict points and provide safer routes for students, commuters, and residents.

 

Alternative Options:

If no action is taken, the County would forfeit federal grant funds for safety improvements, resulting in continued gaps in pedestrian infrastructure, ongoing drainage deficiencies, and elevated crash risk along both corridors, or the improvements must be constructed using local funds.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/6/2025

151

Approval to submit an application to the Texas Department of Transportation for grant funds in the amount of $1,432,654, with no required match, for the FY 2025 Highway Safety Improvement Program (West Road Project)

2/6/2025

152

Approval to submit an application to the Texas Department of Transportation for grant funds in the amount of $835,096, with no required match, for the FY 2025 Highway Safety Improvement Program (Homestead Road Project)

 

Location:

Address (if applicable):  1. West Road from Veterans Memorial Drive to I-45
                                                                  2.  Homestead Road from I-69 to Mary Francis Drive

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

4

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/22/2026

Anticipated Implementation Date (if different from Court date): 9/22/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Dr. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer 

 

Attachments (if applicable): Resolution