File #: 25-2295    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/28/2025 In control: Commissioners Court
On agenda: 4/10/2025 Final action: 4/10/2025
Title: Request for approval to execute an agreement with EJES Incorporated in the amount of $302,455.00 for Construction Phase Services in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements - 2018, UPIN 19101MF17F01, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Sponsors: Mony Hossain
Attachments: 1. 25-2295-Award-UPIN 19101MF17F01-CPS-Parkway (Mobile Homes)-EJES Inc-P1-v01

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 19101MF17F01

Vendor/Entity Legal Name (if applicable): EJES Incorporated

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with EJES Incorporated in the amount of $302,455.00 for Construction Phase Services in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements - 2018, UPIN 19101MF17F01, Precinct 1, Justification for 0% MWBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

The Parkway (Mobile Homes) Subdivision is in Precinct 1, northeast Harris County, south of the intersection of Park Trail Dr. and Tidwell Rd. The subdivision is a residential mobile home neighborhood consisting of approximately 510 lots. The existing drainage system consists of concrete curb and gutter, and surface flow to a main trunkline drainage culvert that runs south and ultimately outfalls into HCFCD maintained ditch P122-00-00. The existing drainage pipe system is undersized and causes surface waters to back up at the intake areas. This causes localized flooding at the intersections of the roads. Floodplains and Historical Flooding data shows 307 homes were reported structural flooding post-Harvey. The scope of the project includes increasing storm sewer capacity in the existing systems by constructing a wet bottom detention basin.

 

Expected Impact:

This action will allow EJES Incorporated to provide Construction Phase Services to support the construction of the project.

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

09/15/2020

1.h.2

Authorization to negotiate for engineering services

12/15/2020

1.f.2

Professional Services Agreement

05/10/2022

32 (22-2888)

Approval to execute an amendment

01/09/2024

71 (24-0244)

Approval of a Study Report

 

Location: Parkway (Mobile Homes) Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$302,455.00

$302,455.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$302,455.00

$302,455.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$302,455.00

$302,455.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 4/10/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Construction Phase Services Agreement