Skip to main content
Harris County Logo
File #: 25-4680    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/23/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval of change in contract No. 2 with Russell Marine LLC, for the A200 Gated Structure General Maintenance Project, adding 120 calendar days (Clear Creek Watershed, Project ID A200-00-00-X028, Job No. 23/0487, Precinct 2, Justification for 0% MWBE Participation Goal: 0% - Minimal MWDBE Availability).

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): A200-00-00-X028

Vendor/Entity Legal Name (if applicable): Russell Marine LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Minimal MWDBE Availability

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract No. 2 with Russell Marine LLC, for the A200 Gated Structure General Maintenance Project, adding 120 calendar days (Clear Creek Watershed, Project ID A200-00-00-X028, Job No. 23/0487, Precinct 2, Justification for 0% MWBE Participation Goal:  0% - Minimal MWDBE Availability).

end

 

Background and Discussion:

The project replaces six roller-type steel gates installed in 1991 by the US Army Corps of Engineers and turned over to the Flood Control District for maintenance and operation in 1998. In 2020, the Gates were inspected using an underwater camera. Based on the results of the inspection, the Engineer of Record recommended removing Gates from the structure within the next five years and repairing or replacing as needed. This project was awarded based on installing 1 new Gate and refurbishing 5 of the existing Gates. The duration for this scope of work was 174 days. To minimize the cost and schedule risk associated with attempting to refurbishing 34-year-old Gates, the scope was changed to 6 new Gates and there was no cost increase associated with this change. The new Gates shop fabrication has taken 173 days. An additional 120 days are needed to finish the project.

 

Expected Impact:

This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits. 

 

Alternative Options:

This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract which is not recommended as doing so would substantially delay the remaining work in the construction contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/04/2024

7.

Award

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Choose an item.

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Change in Contract and Map