File #: 26-2361    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 4/2/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Transmittal by the Flood Control District of a preliminary engineering report by Isani Consultants, L.P. dated February 27, 2026, and titled Plum Creek Channel Improvements (Sims Bayou Watershed, Bond ID CI-029, Project ID C102-00-00-X001, Precinct 2).
Attachments: 1. C102-00-00-X001 PBM (20240306).pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): C102-00-00-X001

Vendor/Entity Legal Name (if applicable): Isani Consultants, L.P.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a preliminary engineering report by Isani Consultants, L.P. dated February 27, 2026, and titled Plum Creek Channel Improvements (Sims Bayou Watershed, Bond ID CI-029, Project ID C102-00-00-X001, Precinct 2).

end

 

Background and Discussion:

The existing channel consists of a concrete bottom with concrete and sheet pile low flow retaining walls. The slopes above the low flow retaining walls are earthen at various grades. The channel is in poor condition and with significant structural failures along multiple segments. The Flood Control District seeks to design and construct necessary upgrades to the channel. The objective of the project is to reconstruct the concrete lined channel within a project limit to provide a greater channel stability in accordance with Flood Control District criteria, while ensuring the proposed modifications do not create adverse impacts. The Preliminary Engineering Report has evaluated four alternatives (1,2,3 and 4) for channel improvements, performed H&H analysis on each of these alternatives and made cost-effective recommendations. Alternative 3 is the recommended design alternative for channel improvements, featuring an open-channel configuration

 

Expected Impact:

The Plum Creek Channel Improvements is a rehabilitation project designed to enhance the channel’s overall conveyance capacity. Proposed improvements extend alongside the full length of the project, providing greater channel stability throughout the project limits.

Alternative Options:

The alternative should the PER not be approved is the Flood Control District will not be able to proceed with design and construction of the project and flood risk will remain the same.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/26/2024

201.

Agreement

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 4/16/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map