Legislation Details

File #: 26-7853    Version: 1 Name:
Type: Public Necessity Status: Agenda Ready
File created: 11/13/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval to decree that the Harris County Flood Control District project serves a public purpose and public necessity, which requires that the Harris County Real Property Division be directed to acquire one tract for the public project known as West T.C. Jester Stormwater Detention Basin, for the purpose of stormwater detention, authorizing eminent domain if necessary (Cypress Creek Watershed, Bond ID Z-02, Project ID K500-23-00-E005, Tract K100-00-00-15-041.0, CDBG-MIT, Precinct 3).
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): K500-23-00-E005

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to decree that the Harris County Flood Control District project serves a public purpose and public necessity, which requires that the Harris County Real Property Division be directed to acquire one tract for the public project known as West T.C. Jester Stormwater Detention Basin, for the purpose of stormwater detention, authorizing eminent domain if necessary (Cypress Creek Watershed, Bond ID Z-02, Project ID K500-23-00-E005, Tract K100-00-00-15-041.0, CDBG-MIT, Precinct 3).

end

 

Background and Discussion:

The Flood Control District is proposing to construct a stormwater detention basin located South of Cypresswood Drive and West of TC Jester Blvd in Harris County Precinct 3. The objective of the project is to provide approximately 210 acre-feet of stormwater storage capacity at the confluence of Cypress Creek and Spring Gully (Unit K131-00-00). This is a request to approve right-of-way acquisitions. This property is located within the detention basin site limits located south of Cypresswood Drive and West of T.C. Jester Boulevard.

 

Expected Impact:

Completion of the project construction will provide additional storage capacity to reduce the 100- and 500-year water surface elevations upstream of the basin along Spring Gully and Cypress Creek. 

 

Alternative Options:

 

If this request is not approved, it will delay the construction project start and area residents and businesses will continue to be affected by area flooding.

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Findings and Declarations, Metes and Bounds, and Survey