Legislation Details

File #: 24-4099    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/2/2024 In control: Commissioners Court
On agenda: 7/15/2024 Final action: 7/15/2024
Title: Request for approval of a change in contract with Texas Materials Group, Inc., in connection with Transportation Improvements near University of Houston - Cullen Boulevard (Segment B) from South of Wheeler Ave to IH45 - 2019, adding 41 calendar days, with an addition in the amount of $10,452.00, Job No. 20/0124-3, UPIN 19101MF19201, Precinct 1, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable):  Job No. 20/0124, UPIN 19101MF19201

Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Texas Materials Group, Inc., in connection with Transportation Improvements near University of Houston - Cullen Boulevard (Segment B) from South of Wheeler Ave to IH45 - 2019, adding 41 calendar days, with an addition in the amount of $10,452.00, Job No. 20/0124-3, UPIN 19101MF19201, Precinct 1, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program.

end

 

Background and Discussion:

Project includes reconstruction of Cullen Blvd to a 3-lane concrete boulevard with 12 feet wide share use path on each side including streetlights, trees, storm sewer, and 6 signals.

 

This Change in contracts includes:

-                     PCO-4 (Item #86) - Furnish and Install 12-inch pressure rated (150 pounds per square inch) polyvinyl chloride water line with restrained joints in steel casing, complete in place.  Cost proposal for extending 20-inch steel casing for water line ($10,452.00 - 1 day).

 

-                     PCO-5 - Grades adjustment and revised on the proposed sidewalk elevations to properly drain area near the metro rail ($0.00 - 10 days).

 

-                     PCO-6 - Adding four tree grates to the new design with alignment on the sidewalk ($0.00 - 30 days).

 

Expected Impact:

Change allows the contractor to be compensated for additional item quantity and to extend the project term.

 

Alternative Options:

Continue with the project in accordance with the original scope.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing                     

_ Public Health

x Transportation

x Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/14/2020

19.d.9.c

Contract Award

05/11/2021

24

Contract Amendment for additional funds and extension of project term

08/23/2022

45

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable): Cullen Blvd, Houston, Texas 77004

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$10,452.00

$10,452.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$10,452.00

$10,452.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$10,452.00

$10,452.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: July 15, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B