Title: Request for approval of a change in contract with Sago Solutions, LLC, in connection with final construction of On-Call - Asphalt Repairs - 2024, with an addition in the amount of $381,619.34, Job No. 24/0341-2, UPIN 24101MF3FT01, Precinct 1, MWBE Contracted Goal: 29.12%, MWBE Current Participation: 100%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0341, UPIN 24101MF3FT01

Vendor/Entity Legal Name (if applicable): Sago Solutions, LLC.

 

MWBE Contracted Goal (if applicable): 29.12%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sago Solutions, LLC, in connection with final construction of On-Call - Asphalt Repairs - 2024, with an addition in the amount of $381,619.34, Job No. 24/0341-2, UPIN 24101MF3FT01, Precinct 1, MWBE Contracted Goal: 29.12%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

Project includes the maintenance of asphaltic concrete and general construction services throughout Precinct 1. Construction of these improvements performed by Sago Solutions, LCC ensures that the projects are built in accordance with the Harris County regulations.  The change in contract is to add $381,619.34 to the contract amount with 0 calendar days. The change in contract is to include reconciliation of actual quantities used in construction with the estimated quantities included for bidding purposes. At the request of the Precinct this purchase order is being closed.

 

Expected Impact:

This project improves the condition and resilience of County transportation including park trails and general construction services at various locations throughout Precinct 1. Allow Contractor to be compensated for actual work orders that are completed within the Precinct 1 limits.

 

Alternative Options:

Maintain the original scope of the project.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/23/2025

166 (25-0556)

Contract Award

03/31/2026

31 (26-2105)

Contract Renewal

 

Location: Precinct 1

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3239

$

$381,619.34

$381,619.34

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$381,619.34

$381,619.34

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$381,619.34

$381,619.34

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B