Legislation Details

File #: 25-4967    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 7/30/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request by the Office of the Purchasing Agent for approval of an award on the basis of best proposal meeting requirements to LMC Corporation in the amount of $3,998,672 for replacement of Heating, Ventilation and Air Conditioning (HVAC) system at Cullen Blvd. (Annex 14) for Precinct 1 and for the County Clerk to execute any applicable bonds to be received (250178), MWBE Contracted Goal: 7.687%.
Attachments: 1. SUPPLEMENTAL Award Job No. 250178 - LMC Corporation.pdf

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250178

Vendor/Entity Legal Name (if applicable): LMC Corporation

 

MWBE Contracted Goal (if applicable): 7.687%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): n/a

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the Purchasing Agent for approval of an award on the basis of best proposal meeting requirements to LMC Corporation in the amount of $3,998,672 for replacement of Heating, Ventilation and Air Conditioning (HVAC) system at Cullen Blvd. (Annex 14) for Precinct 1 and for the County Clerk to execute any applicable bonds to be received (250178), MWBE Contracted Goal: 7.687%.

 

end

 

Background and Discussion:

The HVAC system at Annex 14 has reached its end of useful life and needs to be replaced.   Project location is in the southeastern part of Harris County. As a result of the improvements, attendees and staff will have a safer and more comfortable environment at Annex 14.

 

Expected Impact:

Completion of this project will increase the reliability of the building’s HVAC system.  This project will also prevent catastrophic HVAC failure and disruption of service.

 

Alternative Options:

The system is currently operating and could be maintained in that capacity; however, it is old and prone to

breaking down. If the system breaks down, parts are no longer available for its repair due to the age of the

equipment.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): S3: Increase accessibility and reliability of County cooling and warming centers.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/12/2025

227

Advertisement

 

Location: Countywide

Address (if applicable): 5737 Cullen Blvd, Houston, TX 77021

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering Service

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 035 - Fund 3227

$

$3,998,672.00

$3,998,672.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$3,998,672.00

$3,998,672.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Michael Burtner, Project Manager, Office of the County Engineer. Kenenth Jackson, Sourcing Manager, Purchasing Services.

 

Attachments (if applicable): Letter