File #: 24-5672    Version: 1 Name:
Type: Report Status: Passed
File created: 9/5/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of Phase 2 study report prepared by 5engineering, LLC for the Countywide Water Wastewater Study, UPIN 21289MF1YK01.

 

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 21289MF1YK01

Vendor/Entity Legal Name (if applicable): 5engineering, LLC

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): 60%

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of Phase 2 study report prepared by 5engineering, LLC for the Countywide Water Wastewater Study, UPIN 21289MF1YK01.

 

end

 

Background and Discussion:

The Countywide Water Wastewater Study, funded by Community Development Block Grant-Disaster Recovery (CDBG-DR) funds, aided Harris County in identifying areas for providing water and/or wastewater services. The objectives of Phase 1 of the Water and Wastewater Study provided sufficient data for recommending projects to the Office of the County Engineer (OCE) for further analysis in Phase 2 and provide a viable Geographic Information System (GIS) database.  In 2023, OCE completed Phase 1 of the Water and Wastewater Study assessing the needs in Harris County Housing and Community Development’s Target Areas. Through this effort, the consultant team collected data to assess existing conditions and identified a list of areas where water and/or wastewater systems could be provided. These areas were ranked in terms of criticality and feasibility. Phase 2 of the study was completed in 2024 and focused on developing a phasing plan to implement improvements, identifying potential funding sources, performing a 30% concept design, and providing cost estimates.

 

 

Expected Impact:

The study developed recommendations for improvements that could potentially provide public water and/or wastewater service to over 9,000 utility connections, removing an estimated 30,000 Harris County residents from individual well and septic systems.

 

 

 

 

Alternative Options:

Without the approval of this study, an estimated 30,000 Harris County residents will continue to rely on individual well and septic systems.

 

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

X Public Health

_ Transportation

_ Flooding

X Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/30/2021

220

Approval of an award based on successful negotiations with the highest overall evaluation and that the County Judge execute an agreement with 5engineering, LLC in the amount of $1,705,486 for professional architectural and/or engineering services to conduct a water and wastewater study for Harris County.

6/27/2023

116

Approval of a Phase 1 study report prepared by 5engineering, LLC for the Countywide Water Wastewater Study, UPIN 21289MF1YK01.

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: September 19, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Disaster Recovery related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Planning and Transportation, OCE

 

Attachments (if applicable): Final Report