Legislation Details

File #: 25-1369    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 2/21/2025 In control: Commissioners Court
On agenda: 3/5/2025 Final action: 3/5/2025
Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with Ardurra Group, Inc. for professional engineering services for the Safe Routes to School Planning Study for the Office of the County Engineer, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240375), MWBE Contracted Goal: 18.83%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: County Engineer

Secondary Department Head/Elected Official: Milton Rahman

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 240375

Vendor/Entity Legal Name (if applicable): Ardurra Group, Inc.

 

 

MWBE Contracted Goal (if applicable): 18.83%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval on the basis of highest overall evaluation and authorize negotiations with Ardurra Group, Inc. for professional engineering services for the Safe Routes to School Planning Study for the Office of the County Engineer, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240375), MWBE Contracted Goal: 18.83%.

end

 

Background and Discussion:

Harris County Office of County Administration received the Energy Efficiency and Conservation Block Grant from the US Department of Energy and one of the components of this grant includes $150,000 funding for the countywide Safe Routes to School Planning Study. The Office of the County Administration is collaborating with the Office of the County Engineer to conduct this planning study.  A Request for Statement of Qualifications (RFSQ) was released to invite statement of qualifications for the professional architectural and/or engineering services to conduct this planning study.  Two proposals were received, and Ardurra Group, Inc. was recommended though the consultant selection process to conduct this study.

 

The Harris County Safe Routes to School Planning Study will guide efforts to improve bicycle and pedestrian mobility and safety along Vision Zero High Risk Corridors, as well as non-infrastructure approaches including bicycle and pedestrian safety education, awareness of the opportunities to safely bike and walk to school. The goal of the Project is to identify and assess existing pedestrian and bicycle infrastructure, analyze traffic patterns and identify potential hazards around school zones, develop strategies to improve safety and encourage walking or biking to school, promote community engagement and collaboration with relevant stakeholders; and provide recommendations for infrastructure improvements and policy changes. The final document will identify potential projects and policies for short-, medium-, and long-term implementation.

 

Expected Impact:

A countywide planning study will be completed for safe routes to school, which will provide guidance for infrastructure projects to increase safe transportation connections to schools.

 

Alternative Options:

If a consultant is not available to conduct this study, the planning effort has to be conducted by staff within the Office of the County Engineer.

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N3: Promote increased physical activity of residents.

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/10/2024

321

Approval for Advertisement

 

Location: Countywide

Address (if applicable):

Precinct(s): Choose an item.

 

Fiscal and Personnel Summary

Service Name

Harris County Safe Routes to School Planning Study

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources:

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/5/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, Director of Community Planning and Transportation, Office of the County Engineer; Margaret Obot, Sourcing Manager, Purchasing

 

Attachments (if applicable): Letter