Legislation Details

File #: 26-4153    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/23/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of a change in contract with Hayden Paving, Inc., in connection with BS2N Hardy/Aldine - 2024, with an addition in the amount of $1,208,508.65, Job No. 25/0017-1, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 99.32%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0017, UPIN 24102MF3B401

Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.

 

MWBE Contracted Goal (if applicable): 21.66%

MWBE Current Participation (if applicable): 99.32%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hayden Paving, Inc., in connection with BS2N Hardy/Aldine - 2024, with an addition in the amount of $1,208,508.65, Job No. 25/0017-1, UPIN 24102MF3B401, Precinct 2, MWBE Contracted Goal: 21.66%, MWBE Current Participation: 99.32%.

end

 

Background and Discussion: The project consists of rehabilitating various asphalt and concrete roadways located within the Hardy/Aldine area of Harris County Precinct 2.  The work includes milling and overlaying existing asphalt pavement, performing required base repairs, and applying prime coat, tack coat, and dense-graded surface overlays across the full roadway width.  The project also includes full-depth concrete pavement repairs, restoration of a smooth riding surface, and installation of new pavement striping.

 

This Change Order is associated with PCO-1 and addresses the overrun quantities resulting from the additional roadway length incorporated into the project scope at the request of Precinct 2.  Per direction from the Precinct, the Contractor has been requested to perform milling, and asphalt overlay for approximately 2.75 additional miles of roadway beyond the original project limits.  This additional work is intended to address deteriorated pavement sections and maintain continuity and uniform roadway conditions throughout the project area.

The added scope includes the same work activities contained in the original contract, specifically the milling of existing asphalt pavement and placement of hot-mix asphalt overlay.  Therefore, no new bid items are required, and the additional work will be compensated through overrun quantities under the existing contract bid items.

This change results in an increase to total quantities measured and corresponding contract value. Based on actual constructed quantities / Final Number documented and recorded in eBuilder/Trimble, the total overrun amount is $1,208,508.65, which represents approximately 18.84% of the total project budget. No additional contract time is being added to the contract.

Expected Impact:

The changes add additional cost to the contract, ensuring the project aligns with its originally intended objectives.  This change order adds $1,208,508.65 to the project contract amount and with no additional days added.

 

Alternative Options:

No alternative options: If no action is taken, the roadway and other infrastructure constructions will not be completed.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

Additional notes related to the Strategic Plan: N/A

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/10/2025

156 (25-2258)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$1,208,508.65

$1,208,508.65

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,208,508.65

$1,208,508.65

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,208,508.65

$1,208,508.65

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/9/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B