Legislation Details

File #: 25-0358    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/27/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval to execute an agreement with Alliance Laboratories, Inc. in the amount of $84,891.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Mound Road Extension from Greenhouse Road along Spring Dr to Cypress Dr - Segment 2; UPIN 24103MF3C501, Precinct 3.
Attachments: 1. 25-0358-Consultant-UPIN 24103MF3C501-Mound Rd Extension- Alliance Laboratories-P3-01092025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 24103MF3C501; Job No. 24/0265

 

Vendor/Entity Legal Name (if applicable): Alliance Laboratories, Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Alliance Laboratories, Inc. in the amount of $84,891.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Mound Road Extension from Greenhouse Road along Spring Dr to Cypress Dr - Segment 2; UPIN 24103MF3C501, Precinct 3.

end

 

Background and Discussion:

The project section of Mound Rd is a 4-lane, median-divided concrete roadway extended from Greenhouse Rd. and transitioning to 2-lane asphalt and gravel roadways terminating at Cypress Dr. Mound Road Extension

project to be divided into two segments to provide accessibility to adjacent developments and finalize the outfall design servicing the project.

 

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

Alternative Options:

Construction materials testing is required by state law. Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/24

128

Approval to negotiate with Alliance Laboratories, Inc. for professional services regarding construction materials testing.

 

Location:

Address (if applicable): : Mound Road Extension from Greenhouse Road.

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$84,891.00

$84,891.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$84,891.00

$84,891.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$84,891.00

$84,891.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): N/A Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure,

Harris County Engineering Department; Corey D. Ritter, CET, Manager of Construction Materials Testing

 

Attachments (if applicable): Agreement