Legislation Details

File #: 24-3051    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 5/16/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a change in contract with John Reed and Company, LLC in connection with Brays Bayou Pedestrian/Bike Bridge near Stella Link/Glen Arbor, with an addition in the amount of $13,961.00, Job No. 23/0286-1, UPIN 19101MF0XZ01, Precinct 1, MWDBE Contracted Goal: 0% - Non-Divisible.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No: 23/0286, UPIN 19101MF0XZ01

Vendor/Entity Legal Name (if applicable): John Reed and Company, LLC

 

MWDBE Contracted Goal (if applicable): 0%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with John Reed and Company, LLC in connection with Brays Bayou Pedestrian/Bike Bridge near Stella Link/Glen Arbor, with an addition in the amount of $13,961.00, Job No. 23/0286-1, UPIN 19101MF0XZ01, Precinct 1, MWDBE Contracted Goal: 0% - Non-Divisible.

end

 

Background and Discussion:

The project is to construct a pedestrian bridge over Brays Bayou to connect the pedestrian facilities from North Braeswood Boulevard to South Braeswood Boulevard, east of Stella Link Road.  The bridge has 3-spans with 226 feet length and approximate 400 feet ramps.

The change order includes the following:

•                     Additional 72.3 SY of 5” thick of black base for temporary sidewalk at $70.00 per SY = $5,061.00.

•                     Additional 3 EA trees removed at $2,000.00 per tree = $6,000.00.

•                     Additional 2 project signs installed at Northside, 1-regular project sign at $1,300.00 and 1-special project sign = $1,600.00. Total = $2,900.00.

•                     Total Additional Amount = $13,961.00 with zero days.

 

Expected Impact:

Provide safe pedestrian and cyclist crossing over Brays Bayou between North Braeswood Boulevard to South Braeswood Boulevard.

 

Alternative Options:

N/A

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing                     

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

09/19/2023

325

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3002

$

$13,961.00

$13,961.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$13,961.00

$13,961.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$13,961.00

$13,961.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 04, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B