Title: Request for approval of a change in contract with AAA Asphalt Paving, Inc., in connection with Asphalt Reconstruction Project - John Ralston Road - 2022, with an addition in the amount of $140,290.00, Job No. 23/0213-1, UPIN 23101MF2MN01, Precinct 1, MWDBE Contracted Goal: 33%, MWDBE Current Participation: 73.29%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0213, UPIN 23101MF2MN01

Vendor/Entity Legal Name (if applicable): AAA Asphalt Paving, Inc.

 

MWDBE Contracted Goal (if applicable): 33%

MWDBE Current Participation (if applicable): 73.29%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with AAA Asphalt Paving, Inc., in connection with Asphalt Reconstruction Project - John Ralston Road - 2022, with an addition in the amount of $140,290.00, Job No. 23/0213-1, UPIN 23101MF2MN01, Precinct 1, MWDBE Contracted Goal: 33%, MWDBE Current Participation: 73.29%.

.end

 

Background and Discussion:

John Ralston Road is a major thoroughfare that is in poor condition and has been identified for much needed rehabilitation in the form of reconstruction and base repair, mill & overlay.  The work changes are to install the following:

•                     30” RCP-Reinforced Concrete Pipe, C76, Class IV, Rubber Gasket (30”), 40 LFT at $285/FT= $11,400.00 and Safety End Treatment (SET) (TYPEII) (30”) (3:1) (Cross), 2 EA at $3,500/EA=$7,000.00, Total Amount=$18,400.00

•                     Cement Slurry, 120 Tons at $385/Ton=$46,200.00 and Stabilized Cement Subgrade, 9,600 SY at $7.50/SY=$72,450.00, Total Amount=$118,650.00

•                     18” RCP-Reinforced Concrete Pipe, C76, Class IV, Rubber Gasket (18”), 24 LFT at $135/FT= $3,240.00

•                     Over-All Total Amount=$140,290.00

 

Expected Impact:

Roadway reconstruction will provide a new road section designed for major thoroughfare traffic and include intersection improvement to accommodate the heavy truck traffic.  Work will also include limited storm sewer,

signing & striping, and site restoration.

 

Alternative Options:

Roadway will continue to deteriorate if repairs and rehabilitation are not performed in the near future.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing                     

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/18/2023

23-4019

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$140,290.00

$140,290.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$140,290.00

$140,290.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$140,290.00

$140,290.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date:  June 25, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B