Title: Request for approval to execute an Interlocal Agreement with Texas Department of Transportation for Telge Road at Grand Parkway State Highway 99 in connection with Telge Road Segment 6 - from 300-feet North of Grant Road to 690-feet North of State Highway 99, UPIN 15104MF0DN03, Precinct 3.
Attachments: 1. 26-6630-ILA - Telge Rd Segment 6 - from 300-ft North of Grant Rd to 690-ft North of SH99 - 2014.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): 15104MF0DN03

Vendor/Entity Legal Name (if applicable): Texas Department of Transportation

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an Interlocal Agreement with Texas Department of Transportation for Telge Road at Grand Parkway State Highway 99 in connection with Telge Road Segment 6 - from 300-feet North of Grant Road to 690-feet North of State Highway 99, UPIN 15104MF0DN03, Precinct 3.

end

 

Background and Discussion:

The Project consists of the design and construction of roadway improvements along Telge Road underpass at SH99. Roadway improvements include the widening of the exiting 2 lane roadway to 4 lanes, installation of a traffic signal at the Eastbound intersection of SH 99 and Telge Road and a traffic signal at the Westbound intersection of SH 99 Telge Road in Cypress, Precinct 3.

 

Expected Impact:

The approval of this agreement will allow Harris County to construct the project.

 

Alternative Options:

Not approving this agreement will prohibit construction of the project. Not being able to construct the project will result in maintaining the current traffic operations and pedestrian accessibility conditions which is not desirable.

 

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Telge Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Agreement