Legislation Details

File #: 24-0591    Version: 1 Name:
Type: Grant Status: Passed
File created: 1/22/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request by the Office of the County Engineer for approval to submit an application to the Houston-Galveston Area Council for grant funds in the amount of $40,000,000, with a required match of $10,000,000, for the 2023 Sheldon Road (South) Reconstruction project (Precinct 2).
Attachments: 1. 24-0591 signed.pdf

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): N/A

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval to submit an application to the Houston-Galveston Area Council for grant funds in the amount of $40,000,000, with a required match of $10,000,000, for the 2023 Sheldon Road (South) Reconstruction project (Precinct 2).

end

 

Background and Discussion:

 

The proposed Sheldon Road (South) Reconstruction project includes widening of the existing roadway from two to four lanes. The project encompasses a bridge section, two major thoroughfare intersections, multiple entrances for industrial and commercial businesses, drainage enhancements, sidewalk installation, and landscaping. These improvements will alleviate congestion, improve transportation safety, increase pedestrian accessibility, address roadway drainage, and increase the transportation system's resilience during severe weather events.

 

Harris County has identified the proposed improvements as a high priority due to the escalating traffic congestion and flooding during extreme weather events along Sheldon Road. The negative impacts of this congestion extend well beyond the project area, impacting businesses, residents, and schools. The proposed improvements will reduce traffic congestion and flooding and increase roadway safety and multimodal access. The grant application will seek $40 million of the Department of Transportation’s federal funds through the H-GAC with $10 million of local matching funds from Precinct 2 for a total project cost of $50 million.

 

Expected Impact:

The submission of this project application, under the Houston-Galveston Area Council’s 2023 Project Selection Process will allow Harris County to seek federal funds to reduce traffic congestion, increase roadway safety and increase Sheldon Road’s resilience during severe weather events.

 

Alternative Options:

 

To not to apply for the H-GAC’s 2023 Project Selection Process and pursue the proposed project with local funding.

 

 

Alignment with Goal(s):

X Justice and Safety

X Economic Opportunity

_ Housing

X Public Health

X Transportation

X Flooding

X Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

N/A

N/A

 

 

Location:

Address (if applicable): Sheldon Road from Wallisville Road to Jacintoport Blvd

 

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Houston-Galveston Area Council’s 2023 Project Selection Process

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$625,000

$1,875,000

Non-Labor Expenditures

$

$11,875,000

$35,625,000

Total Incremental Expenditures

$

$12,500,000

$37,500,000

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Other

$

$2,500,000

$7,500,000

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$2,500,000

$7,500,000

Additional Budget Requested

Grant

$

$10,000,000

$30,000,000

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$10,000,000

$30,000,000

Total Funding Sources

$

$12,500,000

$37,500,000

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: January 30, 2024

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Resilience and Transportation Planning, Harris County Engineering

Attachments (if applicable): Grant Documents.