Legislation Details

File #: 26-3974    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 6/10/2026 In control: Commissioners Court
On agenda: 6/25/2026 Final action: 6/25/2026
Title: Transmittal by the Flood Control District of a certificate of substantial completion with A Morfin Trucking LLC, for the Yale Stormwater Detention Basin (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Precinct 2).
Attachments: 1. E501-03-00-E001 Substantial Completion Certificate - signed.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): E501-03-00-E001

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a certificate of substantial completion with A Morfin Trucking LLC, for the Yale Stormwater Detention Basin (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Precinct 2).

end

 

Background and Discussion:

The Yale Storm Water Detention Basin (SWDB) is an interim project to mitigate future channel improvements along the existing Little White Oak Bayou (E101-00-00). The project consists of design and construction on Flood Control District property, within Precinct 2 and within City of Houston (COH) limits. The Yale SWDB is located just west of the I-45 and East Tidwell Road intersection within the White Oak Bayou Watershed (See Exhibits 1 and 2 attached). This project, along with future improvement projects, will help remove the 500-year area of inundation from an estimated 2,815 structures, 2,520 acres of land and 82.8 miles of roadway.

 

Expected Impact:

Substantial Completion signifies that a flood control project is largely finished, allowing the Flood Control District to begin using most of the infrastructure to realize intended flood risk reduction benefits while the Contractor completes any applicable minor outstanding details.

 

Alternative Options:

There is no viable alternative to accepting substantial completion when a Contractor successfully completes the work scope of a contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

409.

Transmittal of Advertise for Bids

12/10/2024

352.

Award

5/22/2025

96.

Change in Contract No. 1

110/16/2025

149.

Change in Contract No. 2

04/16/2026

130.

Change in Contract No. 3

 

Location: near Southeast corner of East Tidwell and Yale Street

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 6/25/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Certificate of Completion and Map