Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): UPIN 18103N302203
Vendor/Entity Legal Name (if applicable): ExxonMobil Pipeline Company LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an Encroachment Agreement with ExxonMobil Pipeline Company LLC, for roadway pipeline casing extension, in connection with Schiel Road 2, from West of Fairfield Place Drive to West of Mason Road, UPIN 18103N302203, Precinct 3.
end
Background and Discussion:
The Schiel Road 2 project involves the expansion of an existing two-lane roadway into a four-lane boulevard section, featuring a 32-foot-wide raised median and storm sewer improvements. As part of the roadway expansion, it is necessary to encase the existing pipeline from right-of-way (ROW) to right-of-way. The pipeline encasement is a requirement to ensure that the expanded roadway infrastructure is adequately protected, and to minimize future maintenance impacts on the roadway and median improvements. Extending the encasement across the full width of the ROW is critical due to the increased roadway width and the addition of new storm sewer facilities, both of which elevate the risk profile for underground utilities. Ensuring the pipeline is properly encased now will protect the integrity of the pipeline and the roadway infrastructure, while also reducing the likelihood of future conflicts, relocations, or costly repairs.
Expected Impact:
The pipeline encasement from ROW to ROW will enhance the long-term durability and safety of both the pipeline and the expanded roadway. It will reduce the risk of pipeline exposure or damage during or after construction and minimize the need for future excavations that could disrupt traffic or damage the newly constructed improvements. Additionally, this proactive measure will help maintain the overall functionality of the storm sewer system and preserve the integrity of the 32-foot raised median, supporting the County’s goal of delivering a resilient and low-maintenance transportation corridor.
Alternative Options:
Another option is to leave the existing pipeline as-is without additional encasement. This approach would pose a significant danger to public, long-term risk, as any future maintenance or failure of the unencased pipeline would require open cut excavation across the newly expanded roadway, leading to costly repairs, disruption to traffic, and potential damage to storm sewer infrastructure and the raised median.
County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: n/a
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
Location: Schiel Road 2 from West of Fairfield Place Drive to West of Mason Road
Address (if applicable): N/A
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1070 - Mobility Fund |
$ |
$48,465.81 |
$48,465.81 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$48,465.81 |
$48,465.81 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$48,465.81 |
$48,465.81 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 6/12/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services,
Office of the County Engineer
Attachments (if applicable): Encroachment Agreement