Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 21/0030
Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.
MWDBE Contracted Goal (if applicable): 0%
MWDBE Current Participation (if applicable): 0%
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Allgood Construction Co., Inc. in connection with final construction of Gosling Road 3, adding 75 calendar days, with a deduction in the amount of $457,286.45, Job No. 21/0030-6, UPIN 15104MF0CC03, Precinct 3, (project was awarded prior to launch of County’s M/WBE Program).
end
Background and Discussion:
The project includes reconstruction of the existing 2-lane asphalt roadway to a 4-lane concrete pavement section with appropriate drainage system within a 100-foot Right-of-Way.
This change in contract includes the following:
• Addition of 75 days to allow for the construction of a 3-foot-thick clay liner in the proposed detention basin in accordance with the requirements by the Harris County Flood Control District.
• The cost of installation of 2 - 4 section signal head on West Rayford Road and Gosling Road intersection (East Bound Lane). ($7,141.30 - Lump sum)
• The final adjustment which includes the (reconciliation of actual quantities used in construction against the bid quantities). Total = (-$464,427.75)
Expected Impact:
This action allows unused funds to be returned to Harris County and allows the Contractor to be compensated, and to complete the work.
Alternative Options:
No action can result in substandard construction.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
03/30/2021 |
261 |
Contract Award |
08/02/2022 |
44 |
Contract Amendment for additional funds and extension of project term |
08/23/2022 |
34 |
Contract Amendment for additional funds and extension of project term |
09/13/2022 |
65 |
Contract Amendment for additional funds and extension of project term |
12/13/2022 |
48 |
Contract Amendment for additional funds and extension of project term |
Location:
Address (if applicable): Gosling Road.
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
|
|
FY 24 |
FY 25 |
Next 3 FYs |
Incremental Expenditures (do NOT write values in thousands or millions) |
Labor Expenditures |
$ |
$ |
$ |
Non-Labor Expenditures |
-$457,286.45 |
$ |
$ |
Total Incremental Expenditures |
-$457,286.45 |
$ |
$ |
Funding Sources (do NOT write values in thousands or millions) |
Existing Budget |
Other |
-$457,286.45 |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Current Budget |
-$457,286.45 |
$ |
$ |
Additional Budget Requested |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Additional Budget Requested |
$ |
$ |
$ |
Total Funding Sources |
-$457,286.45 |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Court Date: November 14, 2023
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Dr. Hatem Bastawisy, PE, (Interim) Senior Director of Project Delivery, Harris County Engineering Department
Attachments (if applicable): County Auditor’s Form 1258B