Legislation Details

File #: 24-3050    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 5/16/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road, adding 31 calendar days, with an addition in the amount of $223,341.88, Job No. 23/0239-1, UPIN 18103N302203, Precinct 3, MWDBE Contracted Goal: 32%, MWDBE Current Participation: 100%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0239, UPIN 18103N302203

Vendor/Entity Legal Name (if applicable): Sequeira Civil Construction, LLC

 

MWDBE Contracted Goal (if applicable): 32%

MWDBE Current Participation (if applicable): 100%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road, adding 31 calendar days, with an addition in the amount of $223,341.88, Job No. 23/0239-1, UPIN 18103N302203, Precinct 3, MWDBE Contracted Goal: 32%, MWDBE Current Participation: 100%.

end

 

Background and Discussion:

Project included the reconstruction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median.

 

Change includes additional cost for the installation of school flashers, sidewalks, ramps, and reinforced concrete pipe quantities.  Due to an error in stationing on the plans, the quantities were underestimated compared to the actual quantities required for a complete storm sewer system as called out on plans and school flashers were added as new item to the contract. This change in contract also included adding additional time delays due to unforeseen field conditions. This change order is necessary to properly compensate contractor for the additional work and time required.

 

 

New Item

SCHOOL ZONE FLASHERS                                                                                                         $172,003.08

ADA RAMP - TYPE 9                                                                                                                              $3593.20

Existing Item

REINFORCED CONCRETE PIPE (30”) RUBBER GASKET                     $47,745.60

 

 

 

 

Expected Impact:

Change allows the contractor to be appropriately compensated for the work performed while mitigating the additional cost as much as possible.

 

Alternative Options:

The alternative was to add the flashers in the original contract.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

273

Contract Award

 

Location: Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3109

$

$223,341.88

$223,341.88

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$223,341.88

$223,341.88

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$223,341.88

$223,341.88

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 04, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department