File #: 25-2650    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of a change in contract with Structural Integrity Group, LLC, in connection with Astroworld - Pedestrian Bridge Repairs - 2024, with an addition in the amount of $168,936.95, Job No. 24/0424-1, UPIN 25208MF3P701, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Specialized, Technical, or Unique in Nature.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0424, UPIN  25208MF3P701

Vendor/Entity Legal Name (if applicable): Structural Integrity Group, LLC

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  0% - Specialized, Technical, or Unique in Nature

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Structural Integrity Group, LLC, in connection with Astroworld - Pedestrian Bridge Repairs - 2024, with an addition in the amount of $168,936.95, Job No. 24/0424-1, UPIN 25208MF3P701, Precinct 1, Justification for 0% MWBE Participation Goal: 0% - Specialized, Technical, or Unique in Nature.

end

 

Background and Discussion:

The repairs to this pedestrian bridge are a result of a strike by an oversized load on IH-610.  The load struck the bridge in September of 2024 and caused extensive damage to the prestressed concrete bridge beams.  18 beams span the width of the bridge and 17 of them were damaged in some capacity ranging from broken steel strands, concrete deformation and cracking, and cosmetic cracking requiring replacement. The strike left the bridge unusable by NRG and Houston Rodeo.  This change order is to allow the contractor to complete the necessary repairs that were above and beyond what was known at the time this project was bid.  Additional strands were severed, the fascia steel plate was larger than what was anticipated, and there were steel plates under the bridge that needed to be removed.

 

Steel Fascia: $92,040.00

Strand Splices: $67,000.00

Steel Panel Removal: $5,200.00

Additional VOH Beam Repair: $4,696.95

 

 

Expected Impact:

This Change Order allows us to complete the project and pay the contractor for work necessary to restore the bridge to a usable condition.

 

Alternative Options:

Not approving the change order would render the bridge unusable due to the additional repairs necessary to complete the project.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/23/2025

261 (25-0696)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1000 - General Fund

$

$168,936.95

$168,936.95

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$168,936.95

$168,936.95

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$168,936.95

$168,936.95

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B