Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0186, UPIN 19103MF12K01
Vendor/Entity Legal Name (if applicable): SER Construction Partners LLC
MWBE Contracted Goal (if applicable): 21.93%
MWBE Current Participation (if applicable): 43.43%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with SER Construction Partners LLC, in connection with Tower Oaks Meadows Subdivision Drainage Improvements - 2018, deducting 98 calendar days, with an addition in the amount of $250,000.00, Job No. 25/0186-01, Mobility Fund, UPIN 19103MF12K01, Precinct 3, MWBE Contracted Goal: 21.93%, MWBE Current Participation: 43.43%.
end
Background and Discussion:
The project area is located in the Northwest area bounded by Barwood Subdivision on the North, N Eldridge Pkwy on the East, Fallbrook Dr on the South, and Marrs Dr on the West. The subdivision is specifically bounded on the West by HCFCD Unit E133-00-00, on the East by HCFCD Unit E132-00-00. The Tower Oaks Meadows Subdivision primarily served by roadside ditch drainage systems that are directed East to N Eldridge Pkwy, West to HCFCD Unit E133-00-00 and North to an existing storm sewer within a back lot easement on the common line between Tower Oaks Meadows and Barwood Subdivision. The scope of work for this project consists of storm sewer improvements by regrading ditches and providing additional capacity underneath ditches to accommodate for increased conveyance, and full roadway reconstruction in the subdivision. This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community.
The change in contract includes the following:
Add new line items to the project for completion of the proposed scope of work.
New Line Items:
• Added a new line item number 146 for “Project Escalation”, in the amount of $250,000.00 and deduction of 98 calendar days.
The above addition results in an addition in the amount of $250,000.00 and deduction of 98 calendar days.
The County issued the Project’s Notice to Proceed on 09/29/2025. Per Section 5.3 of the Contract’s General Conditions, the work was to be completed within 540 days of the Notice to Proceed, or by 03/22/2027. With this and all other prior approved change orders, the work is to be completed within 442 days of the Notice to Proceed, or by 12/15/2026.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Tower Oaks Meadows subdivision.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
06/26/2025 |
284 (25-3837) |
Transmittal - Advertisement |
|
08/07/2025 |
494 (25-4969) |
Contract Award - SER Construction Partners LLC |
Location: Tower Oaks Meadows subdivision
Address (if applicable): N/A
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Grant |
$ |
$250,000.00 |
$250,000.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$250,000.00 |
$250,000.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$250,000.00 |
$250,000.00 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 8/6/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer