File #: 25-2663    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of the first amendment to the agreement with Harris County Precinct 1 to decrease $2,875,000.00 in 2017 CDBG-MIT funds from the construction line item and reallocating it as follows: $200,000.00 to Architectural/Engineering Design of the Ralston Acres Subdivision Drainage Improvements project and $2,625,000.00 to the construction line and $50,000.00 to the Architectural/Engineering Design of the North Forest Subdivision Drainage Improvements project to adequately cover the cost of construction and design for both projects.
Attachments: 1. Ralston_Amendment 1

Primary Department: Housing and Community Development

Primary Department Head/Elected Official: Thao Costis, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCAType of Request: Contract - Amendment

 

Project ID (if applicable): M2024-003 Ralston Acre Subdivision Drainage Improvements Project

Vendor/Entity Legal Name (if applicable): Harris County PCT 1

 

MWBE Contracted Goal (if applicable): 29.57                                                               

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of the first amendment to the agreement with Harris County Precinct 1 to decrease $2,875,000.00 in 2017 CDBG-MIT funds from the construction line item and reallocating it as follows: $200,000.00 to Architectural/Engineering Design of the Ralston Acres Subdivision Drainage Improvements project and $2,625,000.00 to the construction line and $50,000.00 to the Architectural/Engineering Design of the North Forest Subdivision Drainage Improvements project to adequately cover the cost of construction and design for both projects.

end

 

Background and Discussion:

The Ralston Acres Subdivision Drainage Improvements Project is in east Houston in Harris County Precinct 1. The purpose of the project is to upgrade the existing system to handle the 1% annual exceedance probability (AEP) event with reduced structural flooding. The project includes roadway improvement, ditch regrading, culvert and driveway replacement, outfalls, and cross culverts. Additionally, the project will design two wet bottom detention basins to mitigate increased flows resulting from the improved subdivision drainage.

Expected Impact:

This project seeks to reduce flood risks and strengthen resiliency in Harris County by alleviating property and

structural damages to the adjacent community with improved drainage which will benefits 427 persons of which, 70.02% are LMI. This will reduce the financial, physical, and emotional burden flood damages place on homeowners. It will also reduce the financial impact of recovery costs to Harris County and federal flood insurance program.

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/10/2024

24-7696

Original Agreement

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Infrastructure Investments

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

($2,675,000.00)

($2,675,000.00)

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

($2,675,000.00)

($2,675,000.00)

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

($2,675,000.00)

($2,675,000.00) 

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Disaster Recovery related item

 

Contact(s) name, title, department: Crystal L. Keller, PFI Investments Manager

 

Attachments (if applicable): First Amendment