Legislation Details

File #: 26-2300    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/1/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Request for approval of a change in contract with McKenna Contracting, Inc., in connection with Construction of Pickleball Courts at Russ Poppe Family Park, I.T. May Park, and Meyer Park, adding 93 calendar days, with a deduction in the amount of $17,131.25, Job No. 24/0068-1, UPIN 24103MF30K01, Precinct 3, MWBE Contracted Goal: 19.33%, MWBE Current Participation: 100%.
Attachments: 1. 26-2300-CIC-UPIN 24103MF30K01 Pct 3 - McKenna Contracting - P3-4.9.2026.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official:

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 240068 / UPIN 24103MF30K01

Vendor/Entity Legal Name (if applicable): McKenna Contracting, Inc

 

MWBE Contracted Goal (if applicable): 19.33%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with McKenna Contracting, Inc., in connection with Construction of Pickleball Courts at Russ Poppe Family Park, I.T. May Park, and Meyer Park, adding 93 calendar days, with a deduction in the amount of $17,131.25, Job No. 24/0068-1, UPIN 24103MF30K01, Precinct 3, MWBE Contracted Goal: 19.33%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

 

Design and construction of (3) 64' x 100' x 5" thick Pickleball courts, 10' wide sidewalk that connects the adjacent parking lots to the courts as well as permitting a 25' x 25' concrete slab for a future shade canopy, 8' high perimeter chain-linked fence with (1) 4' wide and (1) 10' wide double gate.

 

This change in contract includes the following:

 

•                     Tree Removal (All Sizes)                                                                                                          4 EA                                                                                    ($2,100.00)                     

•                     Vehicular Gate (8FT Height) (10FT Wide Double Leaf)                      1 EA                                             ($2,258.00)

•                     Pedestrian Gate (8FT Height)                                                                                                         1 EA                                              $1,575.00                                          

•                     Concrete Pavement (Canopy)                                                                             69 SY                                                     ($7,607.25)

•                     Sodding for Erosion Control                                                                                              1605 SY                                           ($6,741.00)

 

The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). ($17,131.25)

 

This change in contract includes scope changes for an additional pedestrian gate at Meyer Park with 93 additional calendar days.

 

Expected Impact:

 

Upon completion, this project will enhance the park to better serve the public and allows unused funds to be returned to Harris County and contractor to be compensated.

 

 

Alternative Options:

 

Commissioner court could postpone the change order, which would postpone the completion of the project.

 

 

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/26/2024

599

Accepted - Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for construction of Pickleball Courts at Russ Poppe Family Park, I.T. May Park and Meyer Park for Precinct 3 (240068)

05/7/2024

202

Approved - Request for approval to award McKenna Contracting in the amount of $622,250.55 for the construction of Pickleball Courts at Russ Poppe Family Park, I.T. May Park and Meyer Park for Harris County Precinct 3.

 

Location:

Address (if applicable): Russ Poppe Family Park- 11675 Grant Rd, Cypress, TX 77429

I.T. May Park- 2100 Wolf Rd. Huffman, TX 77336 and Meyer Park-7700 Cypresswood Drive, Spring, TX 77379

 

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Construction of Pickleball Courts at Russ Poppe Family Park, I.T. May Park and Meyer Park for Harris County Precinct 3

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$-17,131.25

$-17,131.25

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$-17,131.25

$-17,131.25

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$0

$

$0

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$-17,131.25

$-17,131.25

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 4/16/2026

Anticipated Implementation Date (if different from Court date): 4/16/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Andreas Peeples, CPC, CCM, Director of Facilities and Construction, Engineering Group

 

Attachments (if applicable): County Auditor’s Form 1258B (Job No. 24/0068-1)