Legislation Details

File #: 26-5829    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 9/2/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval to execute an agreement with MBCO Engineering, LLC, in the amount of $116,659.25 to provide Professional Engineering Services in connection with Birnam Wood Boulevard - Segment 1, UPIN 20104MF1BG01, Precinct 3, MWBE Contracted Goal: 20%.
Attachments: 1. Award-20104MF1BG01-Birnam Wood-MBCO-P3-9.17.26.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 20104MF1BG01

Vendor/Entity Legal Name (if applicable): MBCO Engineering, LLC

 

MWBE Contracted Goal (if applicable): 20%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with MBCO Engineering, LLC, in the amount of $116,659.25 to provide Professional Engineering Services in connection with Birnam Wood Boulevard - Segment 1, UPIN 20104MF1BG01, Precinct 3, MWBE Contracted Goal: 20%.

end

 

Background and Discussion:

This project will facilitate Extending Birnam Wood Blvd., from 450' north of Hickorygate Dr to south of J109-01-01-2019. Upgrades from 2-lane concrete 1/2 boulevard section to 4-lane concrete curb and gutter boulevard with 32' raised median within a 100' ROW.

 

Expected Impact:

The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.

 

Alternative Options:

If no action is taken, the prime consultant will not be able to proceed with Construction Phase Services, and this location will continue operating under existing conditions.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/13/2020

20.18.1. g.5

Professional Engineering Services agreement approved on court agenda

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3129

$

$116,659.25

$116,659.25

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$116,659.25

$116,659.25

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$116,659.25

$116,659.25

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement