Legislation Details

File #: 26-6499    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 9/28/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request for approval of a change in contract with DVL Enterprises, LLC in connection with final construction of Mound Road Extension From Greenhouse Road along Spring Dr. to Cypress Dr. – Segment 2, adding 41 calendar days, with a deduction in the amount of $234,969.76, Job No. 24/0265-4, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 27.62%, MWBE Current Participation: 19.65%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0265, UPIN 24103MF3C501

Vendor/Entity Legal Name (if applicable): DVL Enterprises, LLC

 

MWBE Contracted Goal (if applicable): 27.62%

MWBE Current Participation (if applicable): 19.65%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with DVL Enterprises, LLC in connection with final construction of Mound Road Extension From Greenhouse Road along Spring Dr. to Cypress Dr. - Segment 2, adding 41 calendar days, with a deduction in the amount of $234,969.76, Job No. 24/0265-4, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 27.62%, MWBE Current Participation: 19.65%.

end

 

Background and Discussion:

 

The project section of Mound Road is a 4-lane, median-divided concrete roadway extended from Greenhouse Road and transitioning to 2-lane asphalt and gravel roadways terminating at Cypress Drive Mound Road Extension project to be divided into two segments to provide accessibility to adjacent developments and finalize the outfall design servicing the project.  This change order compensates the contractor for additional work and time resulting from design revisions, required field clarifications, and necessary construction adjustments, all of which were essential to completing the project.

 

The change in contract includes the following:

•                     Water Pumping                                          1LS                     $27,295.30

•                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities).  -$262,265.06

 

Expected Impact:

This change will allow the Contractor to be properly compensated for the additional work.

 

Alternative Options:

Conduct thorough pre-construction assessments and detailed utility mapping to identify and mitigate potential conflicts early.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/10/2024

351 (24-7429)

Contract Award

08/07/2025

71 (25-4552)

Contract Amendment for additional funds and extension of project term

08/26/2025

37 (25-5135)

Contract Amendment for additional funds

02/12/2026

234 (26-0958)

Substantial Completion

07/09/2026

19 (26-4154)

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable): Mound Road extension at Greenhouse Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

-$234,969.76

-$234,969.76

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$234,969.76

-$234,969.76

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$234,969.76

-$234,969.76

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

$

$

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B