Skip to main content
Harris County Logo
File #: 25-2635    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of a change in contract with Mar-Con Services, LLC, in connection with Aldine Village (EAST) Subdivision Drainage Improvements - 2018, with no change in the amount, Job No. 23/0360-2, UPIN 24208MF33K01, Precinct 2, MWBE Contracted Goal: 24%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0360, UPIN 24208MF33K01

Vendor/Entity Legal Name (if applicable): Mar-Con Services, LLC

 

MWBE Contracted Goal (if applicable): 24%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Mar-Con Services, LLC, in connection with Aldine Village (EAST) Subdivision Drainage Improvements - 2018, with no change in the amount, Job No. 23/0360-2, UPIN 24208MF33K01, Precinct 2, MWBE Contracted Goal: 24%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

The location of the work is in with Aldine Village (EAST) Subdivision in the Halls Bayou Watershed. The proposed improvements include installation of new storm sewer system, roadway paving, channel construction, and driveway removal and restoration work.

 

The change in contract includes the following:

 

Quantity Adjustment: The line items are adjusted to reconcile overrun and underrun quantities on the project for completion of the proposed scope of work.

 

                     The increase of quantities on overrun line-item numbers 3, 6, 7 and 55 for an addition in the amount of $15,239.19.

                     The decrease of quantities on underrun line-item number 9 for a deduction in the amount of $54,328.39.

 

New Line Item:

 

                     Added line-item number 89 - Reimbursement for water valve exploration for an addition in the amount of $15,169.10.

                     Added line-item number 90 - Waterline offset material costs for an addition in the amount of $18,950.50.

                     Added line-item number 91 - Waterline offset 3 ea. above ground assemblies for an addition in the amount of $4,969.60.

 

The above additions and deductions result in a net change in the amount of $0.00 and 0 calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Aldine Village East subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A                     

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

09/19/2023

415 (23-5467)

Transmittal - Advertisement

10/31/2023

317 (23-6470)

Contract Award - Mar-Con Services, LLC

07/15/2024

63 (24-4055)

Contract Amendment (23/0360-1) for additional funds and extension of project term

 

Location: Aldine Village East Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item. 

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC)