Title: Request for approval of a change in contract with Ballast Point Construction, Inc., in connection with final construction of Trail - Fairmont Parkway from HCFCD B100 to Red Bluff Drive - 2021, with a deduction in the amount of $79,898.46, Job No. 23/0224-5, UPIN 22102MF2FC01, Precinct 2, MWBE Contracted Goal: 30%, MWBE Current Participation: 33.71%.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0224, UPIN 22102MF2FC01

Vendor/Entity Legal Name (if applicable): Ballast Point Construction, Inc.

 

MWBE Contracted Goal (if applicable): 30%

MWBE Current Participation (if applicable): 33.71%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Ballast Point Construction, Inc., in connection with final construction of Trail - Fairmont Parkway from HCFCD B100 to Red Bluff Drive - 2021, with a deduction in the amount of $79,898.46, Job No. 23/0224-5, UPIN 22102MF2FC01, Precinct 2, MWBE Contracted Goal: 30%, MWBE Current Participation: 33.71%.

end

 

Background and Discussion:

Construction of 10’ wide trail along Fairmont Parkway from Armand Bayou Hike and Bike Trailhead to Red Bluff Drive, with a pedestrian bridge at Armand Bayou (B100-00-00). Proposed trail includes upgraded audio pedestrian signals, crosswalks, and ramps at signalized intersections at Center Street and Red Bluff Drive.

 

The budget variances across the project resulted from a mix of effective resource management, value engineering, and strategic procurement that led to cost savings in some areas, while necessary scope adjustments, unforeseen site conditions, and regulatory compliance requirements caused certain items to exceed their budgeted amounts. This change will deduct -$79,898.46.

 

 

 

 

 

Expected Impact:

Deduct the total cost for the contract.

 

Alternative Options:

No action will result in substandard construction.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

265 (23-4290)

Contract Award

06/04/2024

85 (24-3097)

Contract Amendment #1 for additional funds and extension of project term

07/15/2024

61 (24-4095)

Contract Amendment #2 for additional funds and extension of project term

09/19/2025

56 (24-5804)

Contract Amendment #3 for additional funds

09/19/2025

54 (24-5806)

Contract Amendment #4 for additional funds

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109

$

-$79,898.46

-$79,898.46

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$79,898.46

-$79,898.46

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$79,898.46

-$79,898.46

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B