Legislation Details

File #: 24-3780    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/13/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval to execute an agreement with Lockwood, Andrews & Newnam, Inc. in the amount of $533,308.54 for Professional Engineering Services in connection with Corridor Study - Veterans Memorial Dr. from Beltway 8 to SH 249; Fallbrook Dr. from Ann Louise Road to Greens Crossing Boulevard, UPIN 24102MF35G01, Precinct 2, MWDBE Contracted Goal: 20%.
Attachments: 1. 24-3780-Consultant- 24102MF35G01- LAN-Veterans Memorial & Fallbrook 6.25.24

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 24102MF35G01

Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc.

 

MWDBE Contracted Goal (if applicable): 20%

MWDBE Current Participation (if applicable): n/a

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Lockwood, Andrews & Newnam, Inc. in the amount of $533,308.54 for Professional Engineering Services in connection with Corridor Study - Veterans Memorial Dr. from Beltway 8 to SH 249; Fallbrook Dr. from Ann Louise Road to Greens Crossing Boulevard, UPIN 24102MF35G01, Precinct 2, MWDBE Contracted Goal: 20%.

end

 

Background and Discussion:

Commissioners Court approved the Harris County Vision Zero Action Plan on September 13, 2022. The Harris County Vision Zero Action Plan has identified corridors and intersections on the High Injury Network to prioritize safety improvement projects. As part of Commissioner Adrian Garcia’s Revive2Thrive initiative, Precinct 2 proposed to conduct a corridor study on Veterans Memorial Drive from Beltway 8 to SH 249 (3.3 miles) and Fallbrook Drive from Ann Louise Road to Greens Crossing Boulevard (3.0 miles).

 

Expected Impact:

The Veterans Memorial and Fallbrook Drive corridor study will include extensive public engagement; in depth safety analysis; and concept development of an inclusive, resilient, and safe corridor. The study will provide engineering solutions for improving safety along the corridor and at intersections for all roadway users, including bicyclists and pedestrians, who are the most vulnerable roadway users. The study will also provide preliminary cost estimates for implementing the preferred corridor concept for Veterans Memorial and Fallbrook Drives. 

 

Alternative Options:

 

Roadway improvements on Veterans Memorial Drive and Fallbrook Drive will be conducted without a concept developed through community engagement and analysis.

 

Alignment with Goal(s):

_ Justice and Safety

X Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

X Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

9/19/2023

157

Authorization to Negotiate for Professional Engineering Services in connection with Corridor Study - Veterans Memorial Drive and Fallbrook Drive - 2023 Precinct 2

 

Location:

Address (if applicable): Beltway 8 to SH 249 on Veterans Memorial Drive and Ann Louise Road to Greens Crossing Boulevard on Fallbrook Drive

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other - Precinct 2 Bond Funds

$

$533,308.54

$533,308.54

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$533,308.54

$533,308.54

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$533,308.54

$533,308.54

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

 

Anticipated Implementation Date (if different from Court date): July 5, 2024

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Direction of Community Planning and Transportation, HCED

 

Attachments (if applicable): Professional Services Agreement