Legislation Details

File #: 25-3121    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 5/8/2025 In control: Commissioners Court
On agenda: 5/22/2025 Final action: 5/22/2025
Title: Request for approval to execute an interlocal agreement with Pasadena Economic Development Corporation (Pasadena EDC) for the proposed non-standard maintenance features for design and construction of a closed storm sewer system on Fairmont Parkway, from Burke Road to 500 feet east of Preston Avenue, and the county will continue to maintain ROW and Roadway and Pasadena EDC will maintain all aspects of drainage including boxes, laterals, inlets and manholes located in Harris County Precinct 2.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): NS102

Vendor/Entity Legal Name (if applicable): Pasadena Economic Development Corporation

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an interlocal agreement with Pasadena Economic Development Corporation (Pasadena EDC) for the proposed non-standard maintenance features for design and construction of a closed storm sewer system on Fairmont Parkway, from Burke Road to 500 feet east of Preston Avenue, and the county will continue to maintain ROW and Roadway and Pasadena EDC will maintain all aspects of drainage including boxes, laterals, inlets and manholes located in Harris County Precinct 2.

end

 

Background and Discussion:

The Pasadena Economic Development Corporation is striving to improve drainage in this community by

providing design and construction of drainage improvements using Atlas 14 storm frequency. This will improve

public safety and transportation. The agreement is required in order to allow for the Corporation to assume

responsibility for the design, construction, and maintenance of drainage improvements.

 

Expected Impact:

The proposed project will improve drainage for surrounding community.

 

Alternative Options:

The alternative would be that the County provide the drainage improvements at a later time.

 

 

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Fairmont Parkway/ Burke Road to 500 feet east of Preston Avenue

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/22/2025

Anticipated Implementation Date (if different from Court date): 5/22/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Debjani Chakravarty, Director Contracts & PMO, Office of a County Engineering.

 

Attachments (if applicable):