Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): P500-06-00-E006
Vendor/Entity Legal Name (if applicable): Lecon, Inc.
MWDBE Contracted Goal (if applicable): 17%
MWDBE Current Participation (if applicable): 48.75%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with Lecon, Inc, for the Lauder Stormwater Detention Basin - Phase 2, resulting in an addition of $1,732.24 to the contract amount. (Greens Bayou Watershed, Bond ID C-34, Project ID P500-06-00-E006, Job No. 22/0224, Precinct 2, MWDBE Contracted Goal: 17%, MWDBE Current Participation: 48.75%).
end
Background and Discussion:
The project consists of excavating the southern compartment of a stormwater detention basin within the former Castlewood subdivision to reduce flooding along the P138-00-00 channel that drains to Greens Bayou. Changes to the contract are required due to the following:
• Harris County Engineering Department’s Permitting Review, which identified the need to change from two 18” Reinforced Concrete Pipes (RCP) to a single 24” RCP at the project driveway.
• The bid failed to establish a dedicated bid item for trench shoring for excavation.
Expected Impact:
This change in contract is needed in order to complete the construction contract for this project. The requested items will ensure the work is completed properly.
Alternative Options:
This is an active construction contract, so there are not many alternatives to approving a change order for this $1,732.24 amount. The other option would be to cancel the contract and procure a new contractor. This is not recommended, as doing so would substantially delay the remaining work in the construction contract.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
08/23/2022 |
253. |
Award |
Location: Lakemont Drive, Houston, TX
Address (if applicable):
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
4.a.2 - Construction Services |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Bonds |
$ |
$1,732.24 |
$1,732.24 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$1,732.24 |
$1,732.24 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$1,732.24 |
$1,732.24 |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: February 27, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Change in Contract and Map