Legislation Details

File #: 26-6603    Version: 1 Name:
Type: Negotiation Status: Agenda Ready
File created: 9/30/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with Lockwood, Andrews & Newnam, Inc. for professional engineering services to provide program management for the Clear Creek Federal Flood Risk Management Program for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (260146), MWBE Contracted Goal: 17%.
Attachments: 1. 26-6603 Negotiations Job No 260146 - Lockwood, Andrews & Newnam, Inc..pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Marcus Stuckett

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 260146

Vendor/Entity Legal Name (if applicable): Lockwood, Andrews & Newnam, Inc.

 

MWBE Contracted Goal (if applicable): 17%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval on the basis of highest overall evaluation and authorize negotiations with Lockwood, Andrews & Newnam, Inc. for professional engineering services to provide program management for the Clear Creek Federal Flood Risk Management Program for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (260146), MWBE Contracted Goal: 17%.

end

 

Background and Discussion:

The Clear Creek Federal Flood Risk Management Project is a partnership project between the U.S. Army Corps of Engineers (USACE) and the Flood Control District. As of the June 2019 Project Partnership Agreement (PPA) between the USACE and the Flood Control District (HCFCD), HCFCD is the lead agency for this project, under a non-federal implementation pilot program authorized by Section 1043(b) of the Water Resources Reform and Development Act (WRRDA) of 2014.  The project is wrapping up the preliminary design stage, which included updating and optimizing the USACE’s Authorized Plan from their 2012 feasibility study.  During this evaluation, it was determined the 2012 Authorized Plan no longer meets the benefits approved by Congress, including having no adverse impacts. The revised PED plan was submitted to the USACE in 2021 in June and was approved in July 2026 and the corresponding FONSI approved in July 2026.  The partnership amendment that reflects the scope change is expected in Q4 2026. 

 

Now that preliminary design stage is nearing completion, this program management contract will replace a previous contract previously procured by HCFCD in 2018.  This contract will oversee the delivery of the PED plan through final design and through construction.  

 

Expected Impact:

The Project seeks to reduce flooding risk in the Clear Creek watershed by increasing channel conveyance and stormwater detention along the main stem and Mud Gully. The project is expected to provide approximately 15,000 structural benefits for the Atlas 14 500-year storm event.  The staff augmentation contract will provide the resources necessary to expedite the completion of the project.

 

Alternative Options:

Reissue the contract or issue requisitions to increase the available staff, which potentially will not meet the needs of the project and potentially delay the delivery of the project.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/30/2026

158

Advertisement of project approved

 

Location:

Address (if applicable): Clear Creek Watershed, Harris and Brazoria County

Precinct(s): Precincts 1 & 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$

$

$

Bonds

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Tommi Jo Scott, Federal Programs Manager, Flood Control District. Kenneth Jackson, Sourcing Manager, Purchasing.

 

Attachments (if applicable): Letter