Legislation Details

File #: 26-0936    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/29/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval to execute an agreement with AIG Technical Services, LLC, in the amount of $1,411,367.00 for Professional Architecture and Engineering Services in connection with Hike and Bike Trail - Mason Creek Trail Extension - 2024, UPIN 25104MF3UU01, Precinct 4, MWBE Contracted Goal: 19.82%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 25104MF3UU01

Vendor/Entity Legal Name (if applicable): AIG Technical Services, LLC.

 

MWBE Contracted Goal (if applicable): 19.82%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with AIG Technical Services, LLC, in the amount of $1,411,367.00 for Professional Architecture and Engineering Services in connection with Hike and Bike Trail - Mason Creek Trail Extension - 2024, UPIN 25104MF3UU01, Precinct 4, MWBE Contracted Goal: 19.82%.

end

 

Background and Discussion:

 

The project is located on the west side of Harris County (PCT 4), near the intersection of Grand Parkway 99 and Franz Road. Project scope includes design and construction of shared use hike and bike primary and secondary trails consisting of asphalt, concrete paths, local street crossings, bridge crossings, curb ramps and high visibility cross walks with regulatory signage.

 

Expected Impact:

 

The proposed hike and bike trail extension will improve specified public pedestrian paths and facilitate safer public mobility.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it.  However, if not approved, the project may not be constructed. As a result, the community may not have improved pedestrian paths to facilitate safer public mobility.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): Vendor Pool Selection

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Grand Parkway and Franz Road

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Professional Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$1,411,367.00

$1,411,367.00

$

Other

$

$

$

$

Total Existing Budget

$

$1,411,367.00

$1,411,367.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,411,367.00

$1,411,367.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/12/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract Agreement