File #: 25-6872    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/17/2025 In control: Commissioners Court
On agenda: 10/30/2025 Final action: 10/30/2025
Title: Request for approval of a change in contract with ECM Construction, LLC, in connection with the final construction of Sidewalk - N. Eldridge Pkwy - 2022, adding 54 calendar days, with a deduction in the amount of $33,186.25, Job No. 24/0224-2, UPIN 23103MF2RP01, Precinct 3, MWBE Contracted Goal: 13.05%, MWBE Current Participation: 100%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0224, UPIN 23103MF2RP01

Vendor/Entity Legal Name (if applicable): ECM Construction, LLC

 

MWBE Contracted Goal (if applicable): 13.05%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with ECM Construction, LLC, in connection with the final construction of Sidewalk - N. Eldridge Pkwy - 2022, adding 54 calendar days, with a deduction in the amount of $33,186.25, Job No. 24/0224-2, UPIN 23103MF2RP01, Precinct 3, MWBE Contracted Goal: 13.05%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

This project involves the construction of sidewalks along North Eldridge Parkway from Spencer Road (FM 529) to West Road, and along West Road from North Eldridge Parkway to 940 feet East (Precinct 3).  This project is federally funded by the U.S. Housing and Urban Development Department (HUD) through the Harris County Community Services Department (HCCSD).

 

This final change order is for a deduction of the final adjustment in the amount of $33,186.25 and includes quantity adjustments of existing items for final values.  Final Adjustment is the reconciliation of actual quantities used in construction against the bid quantities.

 

The final change in contract includes the following:

PCO #5                                          Interceptor addition request-Riser                                          $4,150.00                                          Time: 5 Days

PCO #6                                          AT&T Utility Conflict Delay                                                               $0                                                               Time: 49 Days

PCO #7                                          Final Adjustment                                                                                    ($37,336.25)                                          Time: 0 Day

 

The above additions and deductions result in a net change in the amount of $33,186.25 and 54 calendar days

 

Expected Impact:

Sidewalks were constructed to enhance safety by providing designated pedestrian spaces and reducing conflicts with vehicles. They also improve accessibility and promote walking, fostering greater connectivity for Harris County residents.

The final change adds extra days to the contract, ensuring the contractor is paid for the final estimates, including the retainage, while allowing unused funds to be returned to the precinct.

 

Alternative Options:

The County could elect to approve the requested task or choose to reject it. However, if not approved, the contractor will be delayed for payment of their final pay estimates which include the retainage.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/27/2025

288 (24-5215)

Contract Award

05/08/2025

132 (25-2646)

Contract Amendment #1

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 2601, 2699

$

-$33,186.25

-$33,186.25

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$33,186.25

-$33,186.25

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$33,186.25

-$33,186.25

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/30/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B