Legislation Details

File #: 25-2060    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/19/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request by the Office of the County Engineer for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2023-1, adding 21 calendar days, with an addition in the amount of $507,266.04, Job No. 23/0143-2, UPIN 23103MF2VW01, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 29.07%.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0143, UPIN 23103MF2VW01

Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

 

MWBE Contracted Goal (if applicable): 32%

MWBE Current Participation (if applicable): 29.07%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2023-1, adding 21 calendar days, with an addition in the amount of $507,266.04, Job No. 23/0143-2, UPIN 23103MF2VW01, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 29.07%.

end

 

Background and Discussion:

The project includes roadway rehabilitation of a Cypress North Houston from Jones Road to Perry Road, Telge Road from Kitzman to Grand Parkway, Jones Road from Farm To Market 1960 to Cypress North Houston Road, North Eldridge at South of Lakewood Meadow Drive, Boudreaux Road from Hufsmith-Kohrville to Grand Parkway, Hufsmith-Kohrville from Grand Parkway to Food Control Channel, Hufsmith Road from Farm to Market 2978 to Burroughs Park, and intersection improvement for Telge Road at Boudreaux Road.

This change in contracts includes:

•                     Time due for CenterPoint to connect power to the signal. (21 days)

•                     Cost of slurry for drill shaft foundation. ($5,082.00)

•                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). ($502,184.05)

 

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/27/2023

263 (23-3714)

Contract Award

06/04/2024

59 (24-2988)

Contract Amendment for additional funds and time

12/10/2024

504 (24-7505)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$507,266.04

$507,266.04

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$507,266.04

$507,266.04

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$507,266.04

$507,266.04

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B