Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): 20104MF1BU01
Vendor/Entity Legal Name (if applicable): GC Engineering, Inc <https://app.e-builder.net/da2/Projects/ProjectDetails.aspx?PortalID=%7b6a4d7081-e991-4d32-9e33-cdb93a949858%7d>
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Request Summary (Agenda Caption):
title
Request for approval of a Study Report provided by GC Engineering, Inc, for Shaw Road Segment 2 - from south of Westlake Run Blvd to Boudreaux Rd - 2019, UPIN 20104MF1BU01, Precinct 3.
end
Background and Discussion:
This project is located at Shaw Road in Precinct 3 and is adjacent to other capital improvement projects.
Expected Impact:
This Study Report will provide the necessary information to proceed with the proposed road improvement project which consists of a 4-lane concrete boulevard in a 100-foot ROW with a 32-foot raised median, underground storm sewer, detention mitigation and sidewalks.
Alternative Options:
The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
04/09/2019 |
|
Authorization to Negotiate - GC Engineering, Inc <https://app.e-builder.net/da2/Projects/ProjectDetails.aspx?PortalID=%7b6a4d7081-e991-4d32-9e33-cdb93a949858%7d> |
|
09/29/2020 |
|
Award - Professional Services Agreement - GC Engineering, Inc <https://app.e-builder.net/da2/Projects/ProjectDetails.aspx?PortalID=%7b6a4d7081-e991-4d32-9e33-cdb93a949858%7d> |
|
11/29/2022 |
|
Project Name Change |
|
05/16/2023 |
|
Amendment 1 |
|
|
|
|
|
|
|
|
Location: Shaw Road
Address (if applicable): N/A
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: December 10, 2024
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer
Attachments (if applicable): Study Report