Legislation Details

File #: 24-3103    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 5/20/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a change in contract with Forde Construction Co., in connection with Bridge Repair - Brinsap 2020 Package 3 - 2022, adding 20 calendar days, with an addition in the amount of $233,509.80, Job No. 23/0260-1, UPIN 23103MF2P101, Precinct 3, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 24%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0260, UPIN 23103MF2P101

Vendor/Entity Legal Name (if applicable): Forde Construction Co.

 

MWDBE Contracted Goal (if applicable): 34%

MWDBE Current Participation (if applicable): 24%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Forde Construction Co., in connection with Bridge Repair - Brinsap 2020 Package 3 - 2022, adding 20 calendar days, with an addition in the amount of $233,509.80, Job No. 23/0260-1, UPIN 23103MF2P101, Precinct 3, MWDBE Contracted Goal: 34%, MWDBE Current Participation: 24%.

end

 

Background and Discussion:

The project includes various bridge repairs at six locations withing Harris County Precinct 3 (Jones Road at Cypress Creek, Louetta Road at Theiss Gully, Oak Lane at G103-01-00, Hardy Road South Bound at Cypress Creek Relief, Cypresswood Drive at Cypress Creek, and Tuckerton Road West Bound at Towne Lake Detention).


This change in contracts includes:

•                     Time and cost of additional repair and scope of work on Louetta Road at Theiss Gully based on field condition (installation of extra flowable fill underneath the abutment cap, concrete spall repair, pedestrian rail repair, erosion repair with cement stabilized sand on embankment underneath bridge and bridge longitudinal joint repair). $233,509.80 - 20 days

 

Expected Impact:

Change prevent and avoid further damage to the bridge and allows the Contractor to be compensated for proposed changes.

 

Alternative Options:

Maintain the original scope of the project and fix the repair later which may cause further damage to the bridge.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/29/2023

23-4916

Contract Award

 

Location: Wallisville Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3109

$

$233,509.80

$233,509.80

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$233,509.80

$233,509.80

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$233,509.80

$233,509.80

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 04, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B