Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0415, UPIN 19103MF14A01
Vendor/Entity Legal Name (if applicable): Environmental Allies Inc.
MWBE Contracted Goal (if applicable): 20.21%
MWBE Current Participation (if applicable): 2.94%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Environmental Allies Inc., in connection with Dowdell Woods Subdivision Drainage Improvements, with a deduction in the amount of $196,872.07, Job No. 24/0415-1, Grant Fund, UPIN 19103MF14A01, Precinct 3, MWBE Contracted Goal: 20.21%, MWBE Current Participation: 2.94%.
end
Background and Discussion:
This project is in Northwest Harris County in both the White Oak Bayou and Cypress Creek watersheds. It is west of N. Eldridge Parkway and north of Cypress North Houston Road. The drainage system is currently roadside ditches. The proposed improvements are to regrade the roadside ditches, install a storm sewer system below the ditches, and connect to the K500-01-00 detention basin expansion project for mitigation on this project.
The change in contract includes the following:
The line items are adjusted to reconcile existing bid items, add new line item quantities to the project for completion of the proposed scope of work.
• The decrease of existing bid Item quantities for line item numbers 16, 17, 18, 37, 38, 39, 40, 41 and 42 for a deduction in the amount of $933,673.34.
New Line Items:
• Add a new line item “5 feet X 5 Feet Concrete Junction Box”, Unit of Measure Each, Unit Cost $10,000.00, Quantity 1 Each for an additional cost of $10,000.00.
• Add a new line item “6 feet X 6 feet Concrete Junction Box”, Unit of Measure Each, Unit Cost $12,387.34, Quantity 2 Each for an additional cost of $24,774.68.
• Add a new line item “7 feet X 4 feet Concrete Junction Box”, Unit of Measure Each, Unit Cost $17,887.73, Quantity 6 Each for an additional cost of $107,326.38.
• Add a new line item “8 feet X 8 feet Concrete Junction Box”, Unit of Measure Each, Unit Cost $42,612.91, Quantity 1 Each for an additional cost of $42,612.91.
• Add a new line item “10 feet X 5 feet Concrete Junction Box”, Unit of Measure Each, Unit Cost $43,569.80, Quantity 8 Each for an additional cost of $348,558.40.
• Add a new line item “Fly ash for Subgrade treatment”, Unit of Measure Tons, Unit Cost $216.45, Quantity 425.15 Tons for an additional cost of $92,023.72.
• Add a new line item “Lime/Fly ash Treatment (8-inch depth)”, Unit of Measure Square Yards, Unit Cost $6.75, Quantity 14,520 Square yards for an additional cost of $98,010.00.
The above additions and deductions result in a net change in the amount of ($196,872.07).
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Dowdell Woods subdivision.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
01/09/2025 |
348 (25-0210) |
Transmittal - Advertisement |
|
01/23/2025 |
162 (25-0502) |
Contract Award - Environmental Allies, LLC |
Location: Dowdell Woods Subdivision
Address (if applicable): N/A
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Grant 2601 |
$ |
-$196,872.07 |
-$196,872.07 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
-$196,872.07 |
-$196,872.07 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
-$196,872.07 |
-$196,872.07 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 8/7/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): Change in Contract (CIC)