Legislation Details

File #: 25-7074    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/29/2025 In control: Commissioners Court
On agenda: 11/13/2025 Final action: 11/13/2025
Title: Request for approval of 5 Community Development Block Grant Entitlement (CDBG-EN) funded agreements with 1) Harris County Precinct 3 for Runneburg Estates Road Improvements project total allocation of $972,436; 2) Harris County Water Control and Improvement District No. 21 for Drinking Water Pump Station Improvements project total allocation of $472,170; 3) Harris County Precinct 2 for Cheswick Drive Water Distribution System project total allocation of $1,128,036; 4) Harris County Water Control and Improvement District No. 74 for Sanitary Sewer Improvements project total allocation of $555,582; and 5) Sheldon Road Municipal Utility District for Water Line Improvements project total allocation of $722,309.

Primary Department: Housing and Community Development

Primary Department Head/Elected Official: Thao Costis, Executive Director

 

Secondary Department: Commissioner, Precinct 2 & Commissioner, Precinct 3

Secondary Department Head/Elected Official: Commissioner Adrian Garcia & Commissioner Thomas Ramsey

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): C2025-005c, C2025-005d, C2025-005b, C2025-005e, and C2025-005f

Vendor/Entity Legal Name (if applicable): Harris County Pct 3, WCID No.21, Harris County Pct 2, WCID No.74, Sheldon Road MUD

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of 5 Community Development Block Grant Entitlement (CDBG-EN) funded agreements with 1) Harris County Precinct 3 for Runneburg Estates Road Improvements project total allocation of $972,436; 2) Harris County Water Control and Improvement District No. 21 for Drinking Water Pump Station Improvements project total allocation of $472,170; 3) Harris County Precinct 2 for Cheswick Drive Water Distribution System project total allocation of $1,128,036; 4) Harris County Water Control and Improvement District No. 74 for Sanitary Sewer Improvements project total allocation of $555,582; and 5) Sheldon Road Municipal Utility District for Water Line Improvements project total allocation of $722,309.

end

 

Background and Discussion:

On June 26, 2025, Harris County Commissioners Court approved the PY25 Annual Plan for Entitlement funds, which included a global project that is supported by the above referenced Infrastructure Investments project activities.

 

The goal with these contract awards is to provide funding for Infrastructure Investments project activities that meet the needs of low-and moderate-income residents in Harris County.

 

1.                     HC Precinct 3 for the Runneburg Estates Road Improvements

a.                     Scope: to perform base repair and asphalt roadway improvements on approximately 3,053 LF on Elton Dr., Alpha Ave., and Rownita Street in Crosby TX which include the entire road paving width, length and lanes but will stay within the footprint of the existing roads.

b.                     1,185 persons will of which 78.21 % are low to moderate income.

c.                     Amount of CDBG-Ent funds- $972,436

2.                     HC WCID #21 for the Drinking Water Pump Station Improvements

a.                     Scope: to construct two new drinking water booster pumps at an existing water pump station facility in Channelview, Texas which includes pumps, motors, pipes, electrical, and instrumentation.

b.                     10,630 persons will benefit of which 54.11 % are low to moderate income.

c.                     Amount of CDBG-Ent funds- $472,170

3.                     HC Precinct 2 for Cheswick Drive Water Distribution System Improvements

a.                     Scope: to provide reliable quality drinking water and fire hydrants.  Construction includes 3,175 ft 8-in water line, fire hydrants, services connections and well abandonment along Cheswick Drive.

b.                     2,265 persons will benefit of which 64.07% are low to moderate income.

c.                     Amount of CDBG-Ent funds - $1,128,036

4.                     HC WCID #74 for the Sanitary Sewer Improvements

a.                     Scope: to rehabilitate approximately 5,800 LF of sanitary sewer pipe in the Fairgreen Subdivision of Harris County.

b.                     2,385 persons will benefit of which 54.11 % are low to moderate income.

c.                     Amount of CDBG-Ent funds- $555,582

5.                     Shelton Road MUD for the Water line Improvements

a.                     Scope: to replacement of approximately 4,850 LF and provide updates to the fire protection by installing additional fire hydrants.

b.                     1,865 persons will benefit of which 85.94 % are low to moderate income.

c.                     Amount of CDBG-Ent funds- $722,309

 

Expected Impact:

The anticipated fiscal impact to the County of the three agreements is $3,850,533 in CDBG-EN funds.

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): N/A

Precinct(s): Precincts 2 & 3

 

Fiscal and Personnel Summary

Service Name

Infrastructure Investments

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$136,445

$3,714,088

$3,850,533

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$136,445

$3,714,088

$3,850,533

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$136,445

$3,714,088

$3,850,533

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/13/2025

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Mike Nguyen, Assistant Director-Public Facilities & Infrastructure, HCD

 

Attachments (if applicable): Subrecipient Agreements