Title: Request for approval to execute an amendment with Aviles Engineering Corporation for Professional Engineering Services regarding Construction Materials Testing, in connection with Beaumont Place Subdivision Drainage Improvements - 2018, with an addition in the amount of $94,645.39, UPIN 19101MF17901, Precinct 2, MWDBE Contracted Goal: 100%, MWDBE Current Participation: 100%.
Sponsors: Mony Hossain
Attachments: 1. 24-3534 1st PSA Amendment_Aviles + Exhibits - FINAL SIGNED.pdf

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 19101MF17901

Vendor/Entity Legal Name (if applicable): Aviles Engineering Corporation

 

MWDBE Contracted Goal (if applicable): 100%

MWDBE Current Participation (if applicable): 100%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval to execute an amendment with Aviles Engineering Corporation for Professional Engineering Services regarding Construction Materials Testing, in connection with Beaumont Place Subdivision Drainage Improvements - 2018, with an addition in the amount of $94,645.39, UPIN 19101MF17901, Precinct 2, MWDBE Contracted Goal: 100%, MWDBE Current Participation: 100%.

end

 

Background and Discussion:

This project is located in the Greens Bayou watershed near Highway 90 and Beltway 8. The Beaumont Place subdivision consists of mainly roadside ditches and has been subjected to several flooding events with the most recent being Hurricane Harvey (August 2017) and the Tax Day Flood (April 2016). The scope and proposed improvements include roadside ditch regrading, driveway culvert upgrades, concrete lined Sulphur Gully channel with reinforced concrete box (RCB) crossing improvements.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Beaumont Place subdivision.

 

This agreement amendment will allow the CMT consultant to continue to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials. This testing will ensure the material’s compliance with Harris County Engineering and other governing bodies specifications as required by state law.

 

Alternative Options:

Construction materials testing is required by state law. Thus, alternatives include executing an agreement for similar services to a different vendor or cancelling this construction project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

8/02/2022

22-4546

Approved Authorization to Negotiate

9/27/2022

22-5883

Contract Award for Professional Engineering Services

 

Location: Beaumont Place Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$94,645.39

$94,645.39

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$94,645.39

$94,645.39

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$94,645.39

$94,645.39

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 13, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Contract Amendment