File #: 25-6187    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval to execute an agreement with Brooks & Sparks, Inc., in the amount of $853,611.00 for professional engineering services in connection with sidewalk and signal improvements along Gessner Road from Beltway 8 to West Little York Road, UPIN 25101MF3TC01, Precinct 1, MWBE Contracted Goal: 19.9%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 25101MF3TC01

Vendor/Entity Legal Name (if applicable): Brooks & Sparks, Inc.

 

MWBE Contracted Goal (if applicable): 19.9%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Brooks & Sparks, Inc., in the amount of $853,611.00 for professional engineering services in connection with sidewalk and signal improvements along Gessner Road from Beltway 8 to West Little York Road, UPIN 25101MF3TC01, Precinct 1, MWBE Contracted Goal: 19.9%.

end

 

Background and Discussion:

The corridor currently lacks adequate pedestrian infrastructure, limiting safe access to nearby community amenities such as the White Oak Bayou Trail and Bane Park. The proposed project will deliver 3.4 miles of sidewalk, along west of Gessner Road from Beltway 8 to Litter York Road.  The scope also includes the installation of traffic signals if warranted and street lighting to support safe multimodal access along the corridor.

 

Expected Impact:

Provide enhanced mobility for pedestrians within Gessner Road Area.

 

Alternative Options:

No alternative options. If not approved, the study will be delayed or could be cancelled.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

N/A

N/A

N/A

 

Location: Gessner Road, Beltway 8 to Windfern Forest Dr.

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$853,611.00

$853,611.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$853,611.00

$853,611.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$853,611.00

$853,611.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer.

 