Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0096, UPIN 21289MF1Z601
Vendor/Entity Legal Name (if applicable): Blazey Construction Services, LLC
MWBE Contracted Goal (if applicable): 24%
MWBE Current Participation (if applicable): 100.29%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Blazey Construction Services, LLC, in connection with final construction of Water Distribution and Sanitary Sewer System Construction - West Nelda - 2021, with a deduction in the amount of $214,179.40, Job No. 23/0096-1, UPIN 21289MF1Z601, Precinct 2, MWBE Contracted Goal: 24%, MWBE Current Participation: 100.29%.
end
Background and Discussion:
The proposed construction of West Nelda & West Mierianne Street Water Distribution and Sanitary Sewer Systems Project consists of construction of water distribution line, and construction of sanitary sewer line, decommissioning of water wells for existing lots after installation of water lines.
The project had an initial construction budget of $719,137.80 to connect potable water and sewer lines to 38 residences. Upon bidding and awarding the project, several residents chose not to have water and/or sewer connections. 22 of 38 water connections were made, 19 of 38 sewer connections were made. This is the primary reason of the budget’s reduction. There are some offsets to that reduction with unforeseen field conditions, scope adjustments, and requirements to comply with regulatory standards. Work has been completed in accordance with Harris County standards and specifications. This change in contract allows processing of final pay estimate and close out the project. This resulted in a total contract budget reduction of $214,179.40.
Expected Impact:
This action allows for unused funds to be returned to Harris County.
Alternative Options:
Action required to return unused funds.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
05/16/2023 |
261 (23-2824) |
Contract Award |
Location:
Address (if applicable):
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Other 2601, 2699 |
$ |
-$214,179.40 |
-$214,179.40 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
-$214,179.40 |
-$214,179.40 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
-$214,179.40 |
-$214,179.40 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 5/8/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B