Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) drainage easement, two (2) unobstructed visibility easement & four (4) temporary construction easement tracts for the public project known as North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, for the purpose of roadway construction, UPIN 22103N306630001, Precinct 3.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): 22103N306630001

Vendor/Entity Legal Name (if applicable): Not applicable

 

MWDBE Contracted Goal (if applicable): Not applicable

MWDBE Current Participation (if applicable): Not applicable

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, eight (8) drainage easement, two (2) unobstructed visibility easement & four (4) temporary construction easement tracts for the public project known as North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, for the purpose of roadway construction, UPIN 22103N306630001, Precinct 3.

end

 

Background and Discussion:

The project involves the design and construction of the remaining two southbound lanes of North Eldridge Boulevard from south of Pine Drive to south of Lakewood Meadow Drive to result in a four lane concrete boulevard. Additionally, the current roadside ditches on the east side will be converted to storm drain which will allow the ditches to be filled.

 

Expected Impact:

The project will address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.

 

Alternative Options:

If no action is taken, there will be delays in area mobility improvement.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Various Locations (see attachments)

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

 

Anticipated Court Date: October 8, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

 

Attachments (if applicable): Findings and Declarations; Survey Descriptions and Maps