Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with Halff Associates, Inc. for professional architectural and/or engineering services for South Mayde Creek Bypass Channel and Stormwater Detention Basin for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (260119), MWBE Contracted Goal: 18%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Marcus Stuckett

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 260119

Vendor/Entity Legal Name (if applicable): Halff Associates, Inc.

 

MWBE Contracted Goal (if applicable): 18%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval on the basis of highest overall evaluation and authorize negotiations with Halff Associates, Inc. for professional architectural and/or engineering services for South Mayde Creek Bypass Channel and Stormwater Detention Basin for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (260119), MWBE Contracted Goal: 18%.

end

 

Background and Discussion:

HCFCD requests authorization to negotiate a professional architectural and/or engineering services contract with Halff Associates, Inc. for the South Mayde Creek Bypass Channel and Stormwater Detention Basin project in Precinct 4. This is project funded by state appropriated funds as approved in Senate Bill No. 1, 89th Legislative Regular Session, Article IX, Section 17.18 (32) and is quartile 1 project. The District, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendors if unable to agree on an executable contract.

 

Expected Impact:

The state appropriated funds will be used as approved in Senate Bill No. 1, 89th Legislative Regular Session, Article IX, Section 17.18 (32).

 

Alternative Options:

There is no alternative. Grant needs to be used.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): S4: Reduce the disparate social, economic, environmental, and health impacts of climate change through the implementation of a Harris County Climate Justice Plan.

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/11/26

317

Approval of advertisement for professional architectural and/or engineering services (260119).

 

Location: Addicks Reservoir within Cullen Park

Address (if applicable): N/A

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/25/2026

 

Anticipated Implementation Date (if different from Court date): 8/26/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Fatima Berrios, Engineering Project Manager, Capital Projects South, Flood Control District; Jeremy Woodard, Senior Sourcing Manager, Purchasing Department

 

Attachments (if applicable): Letter