Legislation Details

File #: 26-3617    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 5/28/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval to execute a Service Outlet Location (SOL) and Data Statement with CenterPoint Energy Houston Electric, LLC for the future traffic signal and related electrical service at/near 18050 Westheimer Parkway, Houston, Texas for improvements associated with the Westheimer Parkway Public Safety Enhancements project, UPIN 23104MF2UE01, Precinct 4.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Commissioner Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): 23104MF2UE01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location (SOL) and Data Statement with CenterPoint Energy Houston Electric, LLC for the future traffic signal and related electrical service at/near 18050 Westheimer Parkway, Houston, Texas for improvements associated with the Westheimer Parkway Public Safety Enhancements project, UPIN 23104MF2UE01, Precinct 4.

...end

 

Background and Discussion:

 

The Westheimer Parkway Public Safety Enhancements project includes pedestrian safety and accessibility improvements along Westheimer Parkway. The project includes a new signalized crossing/traffic signal infrastructure requiring permanent electrical service from CenterPoint Energy Houston Electric, LLC.

 

CenterPoint Energy issued the attached Service Outlet Location and Data Statement dated May 5, 2026, identifying Harris County as the customer and listing the service address as 18050 Westheimer Parkway, Houston, Texas. The SOL identifies that CenterPoint construction is required and that the customer must coordinate installation of the meter pole or weather head, obtain applicable permits, and select a competitive retail electric provider prior to meter activation.

 

The SOL further notes that CenterPoint Energy will replace existing poles with taller poles to gain clearance for the future traffic signal and install a single-phase transformer for 120/240V service. Harris County will be required to comply with CenterPoint service standards, applicable National Electrical Code requirements, and other applicable local governing body requirements.

 

Expected Impact:

 

 Approval of this request will allow Harris County to execute the CenterPoint Energy SOL and continue the utility coordination required for the Westheimer Parkway Public Safety Enhancements project. The electrical service is necessary to support the proposed traffic signal/safety improvements and help improve pedestrian safety, ADA accessibility, and overall public safety along the corridor.

 

Alternative Options:

 

No other recommended solutions for this identified need.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/11/2025

25-7800

Execute a Real Estate Application with USACE

5/8/2025

25-2699

Execute an interlocal agreement with Fort Bend County

 

 

 

 

Location:

Address (if applicable): 18050 Westheimer Parkway, Houston, TX 77450

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Roadway & Facility Infrastructure Maintenance

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 6/11/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM Chief of Engineering and Architectural Services

 

Attachments (if applicable): Service Outlet Location Statement (SOLS)