File #: 25-0595    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/10/2025 In control: Commissioners Court
On agenda: 1/23/2025 Final action: 1/23/2025
Title: Request for approval to execute an agreement with Scientech Engineers, Inc. in the amount of $996,994.00, for professional engineering services in connection with Roadway - Reconstruction of Navigation Boulevard from Lockwood Drive to Mack Street - UPIN 22102MF2D601, Precinct 2, MWBE Contracted Goal: 19.60%.
Attachments: 1. 25-0595-Award-UPIN 22102MF2D601- PSA-Roadway - Reconstruction of Navigation Boulevard-Scientech-01.09.2025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 22102MF2D601

Vendor/Entity Legal Name (if applicable): Scientech Engineers, Inc.

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Scientech Engineers, Inc. in the amount of $996,994.00, for professional engineering services in connection with Roadway - Reconstruction of Navigation Boulevard from Lockwood Drive to Mack Street - UPIN 22102MF2D601, Precinct 2, MWBE Contracted Goal: 19.60%.

end

 

Background and Discussion:

The project is located in the City of Houston limits and is a joint participation project with Buffalo Bayou Partnership. On January 4th, 2022, Commissioners court approved an Interlocal agreement with Buffalo Bayou   for Study and Design of Navigation Boulevard from Lockwood Drive to Ssgt Macario Garcia Drive, based on that agreement, on February 8th of 2022 Scientech Engineers, Inc. was awarded a contract of $997,837.30 for Professional Engineering Services to provide a Corridor Study for Navigation Boulevard from Lockwood Drive to Mack Street.

 

Expected Impact:

Scientech Engineers Inc. will provide Design Phase services to develop bid documents outlining the proposed work to be constructed for the reconstruction of Navigation Boulevard. The project will convert one existing travel lane in each direction on Navigation Boulevard to be able to provide for a wider center median which will provide for a new 12 feet trail/bike path, median pedestrian lighting, landscaping, hardscaping, plazas, and pedestrian park like traffic. It will include the addition of new six (6) feet sidewalks on both the north and south side of Navigation Boulevard, new Signal at Mac Farland and Navigation, new Rectangular Rapid Flashing Beacon at Norwood, new accessibility ramps at all locations and partial augmentations to existing storm sewers and inlets to improve the drainage.

 

Alternative Options:

If no action is taken, the project will not be completed.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: Choose an item.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: The plan aims to enhance accessibility, address safety and infrastructure gaps, and promote sustainable, community-focused transportation.

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/04/2022

22-0186/20

Request for approval of a joint participation agreement with The Buffalo Bayou Partnership in connection with Study and Design of Navigation Boulevard from Lockwood Drive to Ssgt Macario Garcia Drive, 22102MF2D601, Precinct 2.

02/08/2022

22-0838/69

Request for approval to negotiate with Scientech Engineers Inc. for Professional Engineering Services in connection with the reconstruction of Navigation Boulevard, UPIN 22102MF2D601, Precinct 2.

09/27/2022

22-5885/29

Request for approval to execute an agreement with Scientech Engineers, Inc. in the amount of $997,837.30 for Professional Engineering Services to provide a Corridor Study for Navigation Boulevard from Lockwood Drive to Mack Street, UPIN 22102MF2D601, Precinct 2, MWDBE Contracted Goal 24%.

 

Location:

Address (if applicable): Navigation Boulevard from Lockwood to Mack Street

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$996,994.00

$996,994.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$996,994.00

$996,994.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$996,994.00

$996,994.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/23/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 