Department: Toll Road Authority
Department Head/Elected Official: Roberto Treviño, P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Proposals/Bids
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A
MWDBE Contracted Goal (if applicable): 19%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval for advertisement of professional services for projects related to the Barrier-Free Program for feasibility studies and final design including preliminary engineering investigations and PS&E package development for pedestrian/bike safety improvements and improvements of the Harris County High Injury Network along the toll road system (Countywide). MWDBE Contracted Goal: 19%.
end
Background and Discussion:
As part of the implementation of the Barrier-Free HCTRA Program, professional services are needed to implement pedestrian/bike safety improvement projects which are along the toll road system as well as Harris County High Injury Network improvements along the toll road system. The most qualified firm(s) will provide professional services including feasibility studies and final design to include preliminary engineering investigations (Surveying, Utility, Geotechnical, Environmental, Drainage) and PS&E package development.
The Study and Design Phases will adhere to the following (but not limited to other standards or guidelines as applicable): Harris County Engineering Department (HCED), Harris County Flood Control District (HCFCD), City of Houston (COH), Texas Department of Transportation (TxDOT), AASHTO Guide for Development of Bicycle Facilities design guidelines, and FHWA Bikeway Selection Guide.
With Commissioners Court approval, the solicitation will be advertised for 45 days.
Expected Impact:
Funding for this request will come from the Toll Road Authority.
Alternative Options:
No other recommended solutions for this identified need.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
|
|
|
|
Location:
Address (if applicable): N/A
Precinct(s): Countywide
|
Fiscal and Personnel Summary |
|
Service Name |
Capital Projects & Infrastructure |
|
|
FY 24 |
FY 25 |
Next 3 FYs |
|
Incremental Expenditures (do NOT write values in thousands or millions) |
|
Labor Expenditures |
$ |
$ |
$ |
|
Non-Labor Expenditures |
$ |
$ |
$ |
|
Total Incremental Expenditures |
$ |
$ |
$ |
|
Funding Sources (do NOT write values in thousands or millions) |
|
Existing Budget |
|
Revenue - TRA |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
|
Additional Budget Requested |
|
Choose an item. |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
|
Total Additional Budget Requested |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
|
Additional Positions Requested |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
Anticipated Court Date: January 30, 2024
Anticipated Implementation Date (if different from Court date): Pending solicitation and approval of execution of contract
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority
Attachments (if applicable): N/A