Legislation Details

File #: 24-7212    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/1/2024 In control: Commissioners Court
On agenda: 11/12/2024 Final action: 11/12/2024
Title: Request for approval of a change in contract with AAA Asphalt Paving, Inc., in connection with final construction of Asphalt Roadway Reconstruction - Cypress Place - 2022, with a deduction in the amount of $36,695.05, Job No. 23/0234-1, UPIN 23103MF2W101, Precinct 3, MWDBE Contracted Goal: 32%, MWDBE Current Participation: 41.39%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0234, UPIN 23103MF2W101

Vendor/Entity Legal Name (if applicable): AAA Asphalt Paving, Inc.

 

MWDBE Contracted Goal (if applicable): 32%

MWDBE Current Participation (if applicable): 41.39%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with AAA Asphalt Paving, Inc., in connection with final construction of Asphalt Roadway Reconstruction - Cypress Place - 2022, with a deduction in the amount of $36,695.05, Job No. 23/0234-1, UPIN 23103MF2W101, Precinct 3, MWDBE Contracted Goal: 32%, MWDBE Current Participation: 41.39%.

end

 

Background and Discussion:

This project involves reconstructing Cypress Place Drive into a standard residential asphalt roadway, with a width of 20 to 22 feet.

 

This change in contract includes:

Ø                     Sawcut and Demolition Modified Inlet                                                                                                                              $1,500.00

Ø                     Install Type A Modified Inlet                                                                                                                                                                        $6,500.00

Ø                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). (-$44,695.05).

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated.

 

Alternative Options:

Maintain the original scope of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing                     

_ Public Health

x Transportation

x Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

23-4509

Contract Award

 

Location:

Address (if applicable): Cypress Place Drive

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

-$36,695.05

-$36,695.05

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

-$36,695.05

-$36,695.05

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

-$36,695.05

-$36,695.05

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date:  November 12, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B